My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01713
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:24 PM
Creation date
10/11/2006 10:37:29 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.09
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
9/1/1987
Title
Comments re: GCES Draft Technical Integration Report
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Paoe <br /> <br />eomments <br /> <br />27 Note positive benefits of post-dam: <br /> <br />(1) regulation of river flows and lengthening of the white-water <br />season has certainly been a factor in the increase in the number of <br />boat trips and increase in related recreational benefits. <br /> <br />(2) number of trips would not be as high if Glen eanyon dam did not <br />exist. <br /> <br />2nd paragraph. Last sentence, regarding depletion of 8 native fish <br />species. Is the increase in water temperature and sediment reduction <br />the only reasons why,". . . only 4 remain"? Are there other natural <br />causes not mentioned and worth noting? <br /> <br />28 4th paragraph. Last sentence. eombined releases range from 31,500 cfs <br />to 46,500 cfs, rather than 48,500, as stated. <br /> <br />Total release is stated as ". . . over 25D,OOO cfs". More precisely, <br />from the numbers given, the total release would be 254,500 cfs. <br /> <br />30 1st paragraph. Last sentence. Note that "all other project purposes II <br />are not equal in priority to each other. <br /> <br />3rd paragraph. 1st sentence, 2nd line. Insert the phrase ". . . <br />objective of maintaining a . . ." between the word lithe II and "minimum". <br /> <br />4th paragraph. 2nd sentence. Should read, "Glen Canyon Dam is operated <br />with the Objective of releasing a minimum of 8.23 maf to the Lower <br />Basin each year . . . etc. II <br /> <br />4th paragraph. Last sentence. Change "must" to "may". <br /> <br />31 1st paragraph. Change "CRSP Act" to "eolorado River Basin Project Act" <br />when referencing "6D2(a) storage". <br /> <br />4th paragraph. The priority of the objectives described in this <br />paragraph are not as stated in Section 1 of the eRSP Act. <br /> <br />35 2nd paragraph. 1st sentence. ehange the word "practical" to <br />"practicable", to be consistent wI the CRSP Act. <br /> <br />General note: Power pays 87 percent of all eRSP costs. <br /> <br />36 1st paragraph. Last sentence. Insert the word "pract i cab 1 e" between <br />the word as "greatest" and "amount". <br /> <br />Mention "renewable" nature of hydro when discussing relative value. <br /> <br />38 Table V-l: <br /> <br />1st item under "Annual Requirements". Insert the word "objective" <br />before the word "minimum". <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.