Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Paqe <br /> <br />Comments <br /> <br />0-36 On the X-axis, delete the word "HOURS" and insert the words "MIDNIGHT", <br />"NOON", and "MIDNIGHT" at the appropriate places. <br /> <br />Figure D-8. (1) Provide horizontal line at 5 MW through graph. Add <br />the note above line "HYDRO LOAD II . (2) General note: re: graph. <br />Hydro load occurs throughout day, not just 5 hours, as indicated. <br /> <br />D-38 3rd paragraph. 2nd sentence. Change 1978 to 1987. <br /> <br />D-40 Figure D-9. The reduction of this figure has made parts illegible. <br /> <br />0-41 Last paragraph. Last sentence. Change "for" to' "or". <br /> <br />12 <br />