My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01700
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01700
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:20 PM
Creation date
10/11/2006 10:37:05 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.130.A
Description
West Divide Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/28/1973
Title
Preliminary Summary Sheets - West Divide Project - Feb. 28-1973
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(~ <br />~ <br />(0 <br />CJ <br /> <br />: ",,\ <br />West Divide Project (cont'd) <br /> <br />Municipal and Industrial <br />Acre-feet . . <br /> <br />. . . . . . . . . . . . . . . . . . . . <br /> <br />. . 77,500 <br /> <br />Nature of use - Municipal, domestic, and oil shale. <br />Timing of demand (acre-feet) <br /> <br />Oil shale <br />Municipal and domestic <br />Tota 1 <br /> <br />1980 <br />5,000 <br />5,000 <br /> <br />1985 <br />20,000 <br />15,000 <br />35,000 <br /> <br />1990 <br />43,000 <br />25,000 <br />68,000 <br /> <br />2000 <br />43,000 <br />34,500 <br />77 ,500 <br /> <br />Quality or Water <br /> <br />Irrigation water - satisfactory. <br /> <br />Municipal and industrial water - <br /> <br />34,500 acre-feet of high quality water to be made available high <br />above the Colorado River that would require minimum treatment by water <br />users for general use. , <br />43,000 acre-feet of lower quality water to be made available in <br />Colorado River that could require considerable treatment by water users <br />before it would be suitable for general municipal and industrial use. <br /> <br />Municipal and Industrial Water Charges <br /> <br />Proposed rates for raw project water <br />High-quality water available in project canals (34,500 ac.-ft.) <br />$28/ac.-ft. <br />Low-quality water available in COlorado River (43,000 ac.-ft.) <br />$8.20/ac.-ft. <br /> <br />Current rates being charged for potable water delivered in tap by <br />speclfled cltles near proJect area!! <br /> <br />Rifle, Co1orado--based on annual use of .18 <br />acre-foot municipal and 1.8 acre-feet <br />industrial <br />G1enwood Springs, Co1o.--charges are based on <br />~umber of rooms in house. Cost shown assumes <br />3.5 persons per house and per person use of <br />.18 acre-foot per year. $55/ac.-ft. <br />!J It should be noted that the cost of treating and delivering muni- <br />cipal and industrial water generally far exceeds the raw water cost. The <br />project water delivered at the tap in potable condition could be slightly <br />more or less than the above current rates. <br />f/ Based on contracts with two companies. <br /> <br />Muni ci pa 1 <br />type use <br /> <br />Industri a1 <br />type ,use <br /> <br />~ <br /> <br />'$141/ac.-ft. f/$178/ac.-ft. <br /> <br />:'. <br />~ <br />~~ <br />< <br />i~ <br /> <br />!. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.