My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01695
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01695
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:18 PM
Creation date
10/11/2006 10:37:01 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1987
Author
CWR and PDA
Title
Summary Report Chace La Poudre Basin Water And Hydropower Resoureces Managemnet Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />. <br />, <br />I <br />I <br />. <br />I <br />I <br />I <br />. <br />I <br />I <br />. <br />I <br />. <br />. <br />. <br />. <br />I <br /> <br />6.0 <br /> <br /> Page <br />5.3 STRUCTURAL PLAN ELEMENTS 5-11 <br /> 5.3.1 Identification of Elements 5-11 <br /> 5.3.2 Screening 5-11 <br /> 5.3.3 Application to Shortage Reduction 5-12 <br /> 5.3.4 Pumped-Storage Potential 5-13 <br />5.4 THE ALTERNATIVE PLANS 5-15 <br /> 5,4.1 Plan A 5-17 <br /> 5.4.2 Plan B 5-18 <br /> 5.4.3 Plan C 5-18 <br /> 5.4.4 Plan D 5-19 <br /> 5.4,5 Plan E 5-20 <br /> 5,4.6 Plan B1 5-20 <br /> 5.4.7 Plan C1 5-21 <br />EVALUATION OF ALTERNATIVE PLANS 6-1 <br />6.1 TECHNICAL EVALUATION 6-1 <br /> 6.1.1 Water Storage and Yield 6-1 <br /> 6.1.2 Power Output 6-1 <br /> 6.1.3 Flood Control Opportunities 6-2 <br /> 6.1.4 Water Management Flexibility 6-2 <br /> 6.1.5 Operational Reliability 6-2 <br /> 6.1.6 Risk of Construction Delay and Cost Increase 6-4 <br />6.2 ENVIRONMENTAL EVALUATION 6-5 <br /> 6.2.1 Evaluation Process 6-5 <br /> 6.2.2 Environmental Evaluation Summary 6-6 <br /> 6.2.3 Enhancement Opportunities 6-9 <br />6.3 ECONOMIC EVALUATION 6-11 <br />6.4 SUMMARY OF EVALUATION 6-12 <br />6.5 PREFERRED PLANS 6-21 <br /> 6,5.1 Preferred Plan 6-21 <br /> 6.5.2 Alternative Plan 6-23 <br /> 6.5.3 Other Plans 6-24 <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.