My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01693
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:18 PM
Creation date
10/11/2006 10:36:57 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.400
Description
Title I - Mexican Treaty and Minute 242
Basin
Colorado Mainstem
Date
1/1/1974
Author
IBWC
Title
Minute 242 Annual Report
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />STATUS REPORT DECF~BER 1. 1975 <br />COLORADO RIVER BASIN SALINITY CONTROL PROJECT - TITLE I <br /> <br />Office of Design & <br />Construction, USBR <br />December 15, 1975 <br /> <br />Authorization: <br /> <br />Fundlnl2:: <br /> <br />October r978 <br /> <br /> <br />Notes: Final Environmental State~ent filed with CEQ and 30 day waiting period has elapsed. <br />I <br />test facility being enlarged to accommodate increased interest in desalting plant and permit evaluation of full scale equip~ent. Estimated completion I <br />Harch 1976. I <br /> <br />FY 76 appropriarions requested - $18 million, $20.5 million carryover. <br />I <br />Budget documents totaling $42.3 million for FY 77 have been submitted to Commissioner's Office. <br />I <br /> <br />1. IBWC Minute No. 242 dated August JO, 1973 <br /> <br />2. Public Law 92-320 - Title I, June 24, 1914 <br /> <br />Construction Schedule: <br /> <br />Maier Features <br /> <br />Com letion Dates <br />Special Report Schedu1 d <br />September 1973 December 1975 <br /> <br />April 1977 June 197t <br /> <br />Coachella Canal <br /> <br />Desalting Complex <br />lrrig Manag SV9 June 1977 January 978 <br />Acreage Reduction JUDe 1979 January i977 <br />On-Farm Measures June 1979 June 1979 <br />M.O.D.E. Siphon June 1975 January 1977 <br />Bypass Orain-U. S. June 1977 septerobel1977 <br />Bypass Drain-Mexico June 1977 June 1977 <br />Desalting Plant December 1978 December 1981 <br /> <br />Protective Pumping <br /> <br />Not included but <br />authorized <br /> <br />1. Total funds authorized - $155,500,000 <br /> <br />2. Fund9 appropriated FY 75 (Oct. 74) - $26.000,000 <br /> <br />Remarks <br /> <br />Construction delayed one year to allow co~pletion of studies to construct new siphons <br />and other structures. Repayment negotiations with Districts continuing. fish and <br />wildlife mitigation studies continuing. Design data submitted. Definite Plan Report <br />being deferred. <br /> <br />14,780 acres are under IHS scheduling. <br />Four contracts for pur~hage totaling 700 ~cres signed by ovners. $790.000. <br />SCS Program approved. Six contracts signed totaling 880 acres. <br />Contract awarded October 10, 1975, to Sully Miller Contracting Co. Notice to Proceed <br />November 10. 1975. <br />Design data received. Final designs underway. <br />Detailed estimate and schedule being prepared by Mexico. Contract for lower reach <br />a~arded. Groundbreaking and award of upper reach held Dece~ber 5. <br />Design daca being prepared. Desalting manufaccurers cesting underway. Desalting <br />equipment requests for proposals being prepared. Definice Plan Report being prepared~ <br /> <br />'" <br />~ <br />r- <br /> <br />Schedule prepared. Alternate locacion of 10 Valley wells being estimated. Concract <br />report on appraisal of State lands received. Definite Plaa Report being prepared. <br /> <br />~ <br /> <br />.... <br />
The URL can be used to link to this page
Your browser does not support the video tag.