My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01673
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01673
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:12 PM
Creation date
10/11/2006 10:36:24 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.700
Description
Colorado Big Thompson Project - Annual Operating Plans
Basin
South Platte
Water Division
1
Date
1/1/2002
Title
Annual Operating Plans - Colorado Big Thompson Project and Western Division System Power Operations - Calendar Year 2002 Summary of Actual Operations and Calendar Year 2003 Annual Operating Plans
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'::J <br />'::) <br />N <br /> <br />:. ". ~ <br /> <br />-.:.I <br /> <br />FLOOD BENEFITS <br /> <br />Precipitation on the upper Colorado River basin was significantly low for the third consecutive year. <br />Snov..pack remained below average during most of the winter and spring. Consequently. the C-BT <br />reservoir levels were below average during most of the Water Year. <br /> <br />According to figures provided by the U.S. Army Corps of Engineers, C-BT reservoirs did not prevent <br />any flood damages during Water Year 2002. <br /> <br />Since construction, the C-BT has prevented flood damages totaling $316.000. <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.