My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01672
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:12 PM
Creation date
10/11/2006 10:36:22 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powel-Glen Canyon Adaptive Management
Basin
Colorado Mainstem
Water Division
5
Date
10/17/1995
Title
Western Area Power Administration-Final Will Be Organization
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />01394 <br /> <br />CSO Financial Management <br />This group supports the budget and financial needs of the cso. <br /> <br />Several employees commented that the eso financial management group should be combined <br />with the Budget arid Analysis function under the ChiefFinancial OfI:ice. To assure that eso- <br />specific financial support has the focus it needs, the final "Will Be" maintains the separation. <br />Comment was also received that CSO financial management should be separate and distinct from <br />CSO administrative support. This comment was adopted in recognition of the separate identity of <br />these two groups and the similar organiutional structure in the customer service regions. <br /> <br />The size of the staff also received comment. In addition to HQ budget and management analysis, <br />the proposed ''Will Be" suggested that journal vouchers, accounts payable, imprest, travel and <br />certification should be the responsibility of this office. Finance staff currently perfonn these <br />functions. Four FIE were transferred from the CFO in response to this comment. <br /> <br />Final staffing level: 8 FTE <br /> <br />Procuremeot <br />This office supports Western's procurement activities. <br /> <br />eomments called for backup and support for the single procurement specialist within each <br />construction office. To provide this support, and to be consistent with the philosophy of <br />decentralization, each of the three construction procurement specialists has been realigned within <br />the appropriate CSR procurement staff and will no longer report to the Procurement Office in the <br />CSO. Collaboration among regional and CSO staffwill play an important part in our <br />decentralization efforts. Three FIE were transferred as a result. <br /> <br />Comments also noted that a small business coordinator and a construction collaboration facilitator <br />were needed in the eso. These functions are appropriate in the eso, but need to be absorbed <br />into the final staffing levels. ' <br /> <br />Final staffing level: 13 FTE, 3 contractor, <br /> <br />Administrative Support <br />This group provides a wide range of administrative support to the CSO, including managing <br />property, facilities, printing, reproduction, travel, mail, infonnation processing and realty. <br /> <br />Comments said that the contractor levels in the proposed ''Will Be" were too low to support <br />various office services and did not adequately allow for management and administration of <br />contracts. The evidence in the business case was persuasive, and the level of contract support <br />was raised by three. Graphics and technical writing support was moved to the Corporate Affairs <br />Office and drafting support was moved to the CPO Design Division. <br /> <br />Final staffing level: 13 FIE, 23 contractor <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.