Laserfiche WebLink
<br />. "'J <br /> <br />.",..1 <br /> <br />:t~~X~) <br />".'" <br /> <br />,;)~), <br />':.'J:~;. <br />'~2~::' <br /> <br />Man-DayS Required <br /> <br /> Man-days Cost, <br /> 0 Reconnaissance: locating gages, etc. 6 $ 1,080 <br /> Preparation of work plan 2 360 <br /> U' <br /> ~ Obtaining equipment, supplies, vehicles, etc. 3 450 <br /> ~ <br /> Prior to release <br /> 1 man for 2 days (3 trips) 6 500 <br /> During release Z7 3,070 <br /> Onions 3 days <br /> Steger 7 days <br /> Warren 7 days <br /> Grozier 4 days <br /> :Brennan 3 dnye [ <br />"''1 <br />(;':!; Jesik 3 days <br />"."'. <br /> After release <br /> Warren 4 days 4 360 <br /> Analysis of samples collected 10 880 <br /> Office compilation and tabulation 5 590 <br /> $ 7,290 <br /> Travel (43 days) 1,920 <br /> Vehicles (est. 4,100 miles) 1,000 <br /> $10,210 <br /> <br />.1 <br /> <br />5 <br />