Laserfiche WebLink
<br />"'"' <br /> <br />"!:!' <br />In <br />- <br />l <br />" <br /> <br />-.:i.: <br /> <br />Our present reconnaissance studies have considered irrigation, <br /> <br />power, recreation, and fish and wildlife and indicate t.hnt a multiple- <br /> <br />purpose project may be justified. <br /> <br />Field data from former reconnaissance surveys have been llsed <br /> <br />largely for present appraisal of the lands and for estimates of <br /> <br />engineering features. <br /> <br />Just this month, the National Park Service made an inspection <br /> <br />q 8)QnK. of the Juniper Reservoir site as seen here from a point about one <br /> <br />/0 <br /> <br />mile north of the dams ite, a nd of Artesia Reservoir site and has <br /> <br />submitted benefit and cost data on recreation which are incorporated <br /> <br />in this statement. <br /> <br />, <br />A preliminary appraisal of the project has been made by the <br /> <br />Bureau of Sport Fisheries and Wildlife and some assumptions based <br /> <br />on this appraisal have been made by the Bureau d:. Reclamation to <br /> <br />include the fish and wildlife function in the project. <br /> <br />The large plan of irrigation development, appearillif, as Plan C <br /> <br />on the slide to your left, jqcludes 32,000 a"res of la'ld j, Colorad0 <br /> <br />'1 <br /> <br />jD -l5/&n< <br />