Laserfiche WebLink
<br />-- <br />L" <br />I.n <br /> <br />.... <br /> <br />( <br />C <br /> <br />switchyard, and transmission system would cost about 12 million <br /> <br />dollars. The laterals and drains are estimated to cost 10 million <br /> <br />~ () <br /> <br />dollars each. ~E~~~ia Res~oir, which area is seen oon 'lii.le south <br /> <br />~ ...., <br />. ~ <br />~- <br /> <br />-, , <br /> <br />of Artesia from Colorado's Highway No. 64, is estimated at six and <br /> <br />one-half million. The remaining three plus million dollars would <br /> <br />be for five small, canals and for recreation facilities at the <br /> <br />Juniper and Artesia reservoirs. The recreation facilities would <br /> <br />cost $904,000 and require an average of $86,000 annually for OM&R. <br /> <br />The total OM&R would be about $525,000 annually, including recreation. <br /> <br />Benefits from the Juniper Project would be from irrigation, <br /> <br />power, recreation, and fish and wildlife, with the possibility of <br /> <br />future added benefits from municipal and industrial water supplies. <br /> <br />30 Bllli1k <br />The evaluation of annual benefits is as follows: <br /> <br />Irrigation <br />Power <br />Recreat ion <br />Fish and wildlife <br />Total . . . . <br /> <br />.$7,600,000 <br />672 ,000 <br />380,000 <br />84,000 <br />.$8,736.0oa <br /> <br />13 <br />