My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01639
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:01 PM
Creation date
10/11/2006 10:35:16 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.A
Description
UCRBRIP Habitat Restoration
Basin
Colorado Mainstem
Date
10/8/1998
Author
UCRBRIP
Title
Final Habitat Restoration Program FY 1999 Work Plan
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />) <br /> <br />COLORADO RIVER RECOVERY PROGRAM <br />FY-1999 PROPOSED SCOPE OF WORK <br /> <br />No.: CAP-26 <br />(for MC Use) <br /> <br />Lead Agency: <br />Submitted by: <br />Address: <br /> <br />U.S. Bureau of Reclamation <br />Brent Uilenberg <br />Bureau of Reclamation <br />P.O. Box 60340 <br />Grand Junction, CO 81506 <br />(303) 248-0641 <br />October 20, 1998 <br /> <br />Category (check one) <br />_Ongoing project <br />~ Requested new <br />Unsolicited <br /> <br />Expected Funding <br />Annual Funds <br />~ Capital <br />Other Funds <br /> <br />Phone: <br />Date: <br /> <br />Proiect Team <br />Bob Norman, Bureau of Reclamation <br />Mark Wernke, Bureau of Reclamation <br /> <br />Title of Program <br /> <br />Fish Passage at the Hartland Diversion Dam. <br /> <br />II Relationship to RIPRAP <br /> <br />Colorado River Action Plan: Gunnison River II.B.2. <br /> <br />III Study Goals, Objectives, End Product <br /> <br />Pursuant to the recommendations provided in DISCUSSION OF THE RELA T/VE MERITS <br />FOR FISH PASSAGE A T HARTLAND DIVERSION DAM ON THE GUNNISON RIVER NEAR <br />DEL TA, COLORADO (Burdick, January 1996) provide fish passage at the Hartland <br />Diversion Dam. <br /> <br />IV Study Area <br /> <br />Gunnison River in the vicinity of the Hartland Diversion Dam (RM59.9) <br /> <br />V Task description <br /> <br />1. Obtain permission from landowner to gain access to the site. <br /> <br />2. Preliminary study to identify alternatives. A site specific study will be conducted to <br />identify and develop alternative fish passage options at the Hartland Diversion Dam. <br />A study team composed of water user representatives, Reclamation and Fish and <br />Wildlife Service staff, and consultant(s) will be formed to conduct the study. <br />Hydrologic, hydraulic, geologic, topographic and structural data will be collected at <br />the site. This information will be used to develop the alternative fish passage <br />options. The study will conclude with a report documenting the data collected; the <br />process used to identify and develop the alternatives; and make recommendations <br />regarding the alterative to be implemented based on technical considerations. <br /> <br />Hartland 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.