My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01639
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:01 PM
Creation date
10/11/2006 10:35:16 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.A
Description
UCRBRIP Habitat Restoration
Basin
Colorado Mainstem
Date
10/8/1998
Author
UCRBRIP
Title
Final Habitat Restoration Program FY 1999 Work Plan
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />passes native fish. proceeding with the design and construction of <br />passage at these other sites could be recommended. This would allow <br />current schedules identified by the RIPRAP for completion of fish <br />passageways at these other sites to be met. <br /> <br />VII. Task Description and Schedule <br /> <br />Description <br /> <br />Task 1. Capture sub-adult and adult Colorado squawfish with <br />electrofishing and implant with radio transmitters. <br /> <br />Task 2. Deploy automatic radiotelemetry system. monitor movements of <br />radiotagged fish. download and operate radiotelemetry system. <br /> <br />Task 3. Capture sub-adult and adult native fishes: flannelmouth <br />sucker. bluehead sucker. and roundtail chub with <br />electrofishing--implant 1.000 PIT t~gs between these three <br />native fishes; capture and Floy tag nonnative fishes such as <br />carp. white suckers as encountered. <br /> <br />Task 4. Sample upstream. downstream. and in the immediate.vicinity of <br />the GVIC diversion dam with electrofishing to recapture <br />previously PIT and Floy-tagged fish. <br /> <br />Task 5. Prepare RIP annual progress report. <br /> <br />Task 6. Analyze field data; Prepare final report. <br /> <br />Schedule <br /> <br />Task 1. 3/98~6/98 <br /> <br />Task 2. 3/98~9/98 <br /> <br />Task 3. 3/98~4/98; ~Z~j(I~ <br />Task 4. 5/98~9/98; ~V~~ <br /> <br />Task 5. 10/98~12/98 <br /> <br />Task 6. <br /> <br />la;h{lJ~:jc":Vt9.p <br />""",-"-{if~~~,,,",,,'i( <br /> <br />GVIC 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.