My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01625
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01625
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:55 PM
Creation date
10/11/2006 10:34:40 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.854
Description
Palo Verde Unit - Colorado Salinity River Control Program
State
CA
Basin
Colorado Mainstem
Date
7/1/1981
Title
Palo Verde Irrigation District Unit Special Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FUTURE ACTIVITIES <br /> <br />Monitoring of the canal and lateral system will continue. The salinity <br />contributions from the District will be monitored throughout continued <br />planning. An evaluation of the flushing or accelerated leaching test will be <br />made to verify its effectiveness. <br /> <br />Continued salt and water budget work will determine what quantity of water <br />can actually be conserved by reducing phreatophyte and other consumptive <br />uses. <br /> <br />If lateral lining in the Palo Verde subarea can be justified under the <br />salinity reduction objective, improving other canals and laterals in the <br />District would provide some salinity reduction benefits. If the District <br />were able to improve the canals and laterals in the remainder of the <br />District, credit against repayment might be possible in the Rannells and <br />other subareas to the extent that salinity reduction can be justified. <br /> <br />When studies are completed, the Regional Director's proposed report and <br />draft environmental statement would be reviewed by other agencies. <br />Following this review, the report and the environmental statement could be <br />completed and the Secretary of the Interior could request authorization <br />for construction. <br /> <br />If, based on the Secretary's report, Congress authorizes the unit, advance <br />planning studies will be conducted. Costs and designs for a recommended <br />plan would be refined and other options would be considered if new studies <br />prove other alternatives more cost effective, <br /> <br />During advance planning, operation, maintenance, and replacement contracts <br />would be negotiated and signed with the PVID to assure that the new <br />facilities would be operated and maintained efficiently. <br /> <br />OJ294J <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.