Laserfiche WebLink
<br />Federal investment costs <br />Interest during const. <br /> <br />Total investment <br /> <br />Annual equivalent cost <br />(50 years - 7-3/8%) <br /> <br />Annual operating costs <br /> <br />Total annual costs <br /> <br />Salinity reduction at <br />Imperi a 1 (annual <br />equiv. ) <br /> <br />Annual cost per mg/L of <br />salinity reduction at <br />Imperial Dam <br /> <br />Initial salt reduction <br />(tons) y <br /> <br />Onf arm + IMS <br />(60% irrig, <br />efficiency) <br /> <br />$4,000,000 <br />529,000 <br />$4,529,000 <br />$ 344,000 <br /> <br />105,000 <br />$ 449,000 <br />6.3 <br /> <br />$ 71,000 <br /> <br />70,900 <br /> <br />Latera I <br />lining <br /> <br />$17 ,000,000 <br />2,249,000 <br />$19,249,000 <br />$ 1,461,000 <br /> <br />1/ <br /> <br />$ 1,461,000 <br />1.6 <br /> <br />$ 913,000 <br /> <br />17,700 <br /> <br />Latferal lining + <br />anf ann + 1M'; <br />(60% irrig, eff,) <br /> <br />$21,000,000 <br />2,778,000 <br /> <br />$23,778,000 <br /> <br />$ 1,805,000 <br /> <br />105,000 <br />$ 1,910,000 <br />7.9 <br /> <br />$ 242,000 <br /> <br />88,600 <br /> <br />1/ Anticipated reductions in maintenance costs will be developed as a <br />part of future studies. <br />2/ Estimated first year reduction. The amount would decrease gradually <br />from year to year. <br /> <br />The Colorado River Basin Salinity Control Act provided that 75 percent of <br />the total costs of construction for the four authorized salinity control <br />units would be nonreimbursable. The remaining 25 percent would be, reimburs- <br />able and would be allocated between the Lower Colorado Basin Development <br />Fund and the Upper Colorado River Basin Fund, with no more than 15 percent <br />of the reimbursable costs allocated to the Upper Basin Fund. The reimburs- <br />able development costs would be repaid without interest within a 50-year <br />periOd after the development becomes operational. While present studies <br />have been predicated on a similar repayment plan for the PVrD unit, final <br />repayment criteria would be determined as a part of legislation authorizing <br />the unit. <br /> <br />Environmental Considerations <br /> <br />Any plan would include measures for wildlife mitigation and enhancement. <br />Further studies to assess potential impacts to fish and wildlife resources <br />would then enable identification of appropriate incidental habitat replace- <br />ment to offset project associated losses. <br /> <br />14 <br /> <br />O"f)(j) '0 <br />""'-Ii <br />