My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01603
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01603
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:50 PM
Creation date
10/11/2006 10:32:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8271.400
Description
Colorado River Basin Salinity Control Program - news articles
Basin
Colorado Mainstem
Water Division
5
Date
12/29/1961
Title
News Articles - Press Releases -- 1961 - 1993
Water Supply Pro - Doc Type
News Article/Press Release
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. ..>) <br /> <br /> <br />f\). . <br /><:,) <br />(;) <br />l-"" <br /> <br />were deposited with 17 public libraries in the project area and also <br />are available for insllection in the Bureau of Recla.ma.tion' s Y1.1IIla. ProJects. ., . <br />Office, 3800 Avenue 3E, Y1.1IIla., Arizona, adjacent to the Marine Corps Air Station;' <br />Single copies ma:y also be obtained :f'rom the Regional Director, Bureau of . <br />Reclamation, Lower Colorado Region, P.O. Box 427, Boulder City, Nevada. 89005. <br /> <br />Requests for scheduled presentations at the public hearing will. be <br />accepted until 4 p.m., October 3, 1974. Subsequent requests will be handled <br />on a first-come, . first-serve basis following the scheduled presentations. <br />oral and written comments will be limited to the environmental impacts of <br />the project. <br /> <br />";i <br /> <br />--' <br />" <br /> <br />organizations or individuals desiring .to present their statements during ," <br />t, ,i' <br />the hearing should contact the Bureau of Recla.ma.tion at its Boulder City ad'Ores~.,.~ <br />telephone (702) 293-8443 or 293-84ll. Written comments :f'r0lll those una.ble to .. ': <br />attend and those wishing to supplement their oral presentation at the hearing, . , <br />should be sent on or before October 15, 1974, so that they can be included in J <br />the hearing record. <br /> <br />Lundberg eMphasized that oral statements wLll be limited to. l.5 minutes <br />each. Speakers ma:y not trade their time to obtain longer oral presentation; <br />however, the person authorized to conduct the hearing ma:y allow ~ speaker <br />to provide additional ora]. comment after .all persons wiShing to make cOIlDIIent <br />have been heard. <br /> <br />, <br /> <br />.~ <br /> <br />',f <br />-- <br /> <br />Speakers wUl. be scheduled according to the time preference mentioned <br />in their request whenever possibl.e. Any scheduled speaker not present when <br />called wUl. lose his privilege in the scheduled order; however, his name <br />wUl. be recalled at the end of the schedule. <br /> <br />The draft environmental statement on the Colorado River International <br />salinity control. Project describes both the beneficia.l. and adverse <br />environmental e:f1'ects of works designed to improve the quality of water <br />delivered to Mexico under the Mexican Water Treaty. <br /> <br />The key feature is a desalting plant at Yuma destined to be. the <br />world's largest. The plant will lower the salt content of draillage Water <br />:f'r0lll the Gila Project's Wellton-Mohawk Division for blending with Colorado <br />River water delivered to Mexico. <br /> <br /> <br />< <br /> <br />''"' <br />'$ <br />., <br />-1 <br />, <br /> <br />'The project also provides for extension of the Wellton-Mohawk bypass <br />drain :f'rom Morelos Dam to santa Clara. slough in Mexico near the Gulf of <br />California and replacement of the drain's metal flume at Yuma with a concrete <br />siphon" a.cquisition of additional lands in the Painted Rock Dam reservoir. . .....J <br />on the Gila River to provide additional flood storage, reduction of the qUa,nti.t~i <br />of irrigation return flows by acquisition of lands in the Wellton'-Mohawk DiYisi~X:I;1 <br />and irrigation efficiency improvements, and lining the first 49 miles of the t.~ <br />Coachella Cana.l with concrete or replacing this section with a new canal to. I <br />salvage an est:lma.ted 132,000 acre-feet of water now lost to seepage.' <br />'" <br />)! <br /> <br />-'~ <br /> <br />2 <br /> <br />,ci <br />! <br /> <br />- .>., .i, _ 0.' "'-."';:';." ~_.~, <br /> <br /> <br />(_"""'1:}, \ <br />
The URL can be used to link to this page
Your browser does not support the video tag.