Laserfiche WebLink
<br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />\Ii <br />:s <br />t- <br /><:- <br />(...0 <br />>- <br />" <br />/b <br /> <br />eGGEDO <br /> <br />TABLE 1 <br />CONSUMPTIVE USE FACTORS AND VOLUMETRIC LIMITATIONS FOR LAWMA'S DIRECT FLOW WATER RIGHTS <br /> <br />w <br /> <br /> "verage . Max/mu", ......umu'3llVe <br /> Number of - Delivery at Delivery at Delivery for 10 Maximum Cumulative CU Maximum <br /> Measuring Point for Acres Dried Up Measurement Measurement Years Annual Delivery CUas%of Credtt for 10 Annual CU <br />Canal LAWMA's shares by LAWMA Point Point =(3)x(4)x10 =(3)x(5) Delivery Years =(6)x(8) Credit =(7)x(8) <br />- - (ac) (ac-ftlac) (ac~ftIac ) (ac-It) (ac-It) (%) (ac-Il) (ac-Il) <br />(1\ (2) (3) (4) (5) . (6) (7) (8) (9) (10) <br />Fort Bent shares at Clay Creek Turnout Farm Turnout 629.5 2.77 3.82 17,437 2,405 66.2 11,543 1,592 <br />Lamar Shares left in Ditch Canal Flume 23.9 4.02 5.40 961 129 46.7 449 60 <br />Manvel Canal at River Headgate River Headgate 476.0 4.02 5.40 19,135 2,570 50.0 9,568 1,285 <br />X( Canal at River Headgate River Headgate 3,364.2 2.83 4.40 95.207 14,802 65.8 62,646 9.740 <br />Stubbs Canal at River Headaate River Headgate 257.0 2.71 4.44 6,965 1,141 67.9 4.729 775 <br /> .. <br /> <br />Notes. 1) The procedure to calculate the consumptIVe use factors IS documented !O Helton & WIlliamsen s May 10, 1999 memorandum. <br />2) The average delivery at the measuring point is determined from crop irrigation requirement and efficiencies as described <br />in Helton & Williamsen's April 30,1998 memorandum entitled "LAWMA's Consumptive Use Factors and Annual Limitations for Water Rights <br />Located Downstream of John Martin". <br />3) The dried up acres shown in column 3 are documented in LAWMA's February 25,2000 Rule 14 plan proposal. <br /> <br /> HIGHLAND CANAL (3,382LAWMA shares) <br /> I......v. as rCl. VI <br /> Water at C.U. as Pct. Of <br /> Wasteway No. Water at River <br /> Month 3 Headgate <br /> (1) (3) (4) <br /> April 68.2 65.7 <br /> May 73.4 71.3 <br /> June 79.9 78.3 <br /> July 83.2 82.0 <br /> August 84.0 83.1 <br /> September 73.2 71.3 <br /> October 46.5 42.3 <br /> Dettveryat <br /> Wasteway No. Delivery at River <br />Volumetric Umitation 3 Headgate <br />Cumulative Delivery for 10 Years (ac~ft) 90,870 101,940 <br />Maximum Annual Deliverv (ac-ftl 10,804 12,021 <br />Cumulative CU Credit for 10 Years (ac-ft) 73,847 76,761 <br />Maximum Annual CU Credit (ac-ft) 8.622 9,052 <br /> <br />Notes; <br />1) The factors and annual limitations for the deliveries at Wasteway No.3 are derived as described in Helton & Williamsen's April 30, 1998 memorandum. <br />entitled "Calculations of stream Credits - Highland Canal". <br />2) The factors and annual limitations for the deliveries at the river headgate are derived as described in Helton & Williamsen's March 11, 1999 memorandum. <br />entitled "Administration and Operation Highland Canal Water Rights". <br />3) LAWMA's water rights are limited to the months of April through October. It is not necessary to account for 'Hinter retum flows since <br />the stream depletions in November, February, and March exceed the stream accretions in December and January. <br />