My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01579
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:44 PM
Creation date
10/11/2006 10:32:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
12/22/1997
Author
UCRBRIP
Title
1997 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />right time should be enough to remove most of the pike occupying the <br />reach. This specific effort may not be necessary if northern pike <br />are removed from this reach during other studies. <br /> <br />Northern pike and other predators should be removed from the system <br />when encountered during routine sampling operations throughout the <br />Gunnison and Colorado rivers. <br /> <br />The Colorado Division of Wildlife (in accordance with the Non-Native <br />Stocking Procedures) should develop a Fishery Management Plan for <br />Paonia Reservoir that includes an option to eradicate northern pike <br />from the Reservoir. Funding and timing should be evaluated according <br />to the overall priorities of the Recovery Program. <br /> <br />White Buckers should be removed from the Gunnison River when <br />encountered during routine sampling operations. <br /> <br />VIII. <br /> <br />Project Status: Completed <br /> <br />IX. FY 97 Budget <br /> <br />A. Funds provided: 7 K <br />B. Funds Expended: 7 K <br />C. Difference: 0 <br />D. Publication charges 0 <br /> <br />X. <br /> <br />Status of Data Submission: Data have been submitted to the UCRB <br />Database. <br /> <br />XI. Signed: C.W. McAda, December 5, 1997 <br /> <br />Appendix <br /> <br />McAda, C.W. 1997. Mechanical removal of northern pike from the Gunnison <br />River, 1995-1996. Colorado River Recovery Implementation Program, <br />Project Number 58, Final Report. U.S. Fish and Wildlife Service, Grand <br />Junction, Colorado. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.