My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01579
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:44 PM
Creation date
10/11/2006 10:32:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
12/22/1997
Author
UCRBRIP
Title
1997 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY 97 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: CAP-23 <br /> <br />I. Project Title: Grand Valley Project Fish Passage <br /> <br />II. Principallnvestigator(s): Brent Uilenberg <br />Bureau of Reclamation <br />P.O. Box 60340 <br />Grand Junction CO 81506 <br />builenberg@ibrBgwB.usbr.gov <br />Phone 970-248-0641 <br />FAX 970-248-0601 <br /> <br />III. Project Summary: <br /> <br />The project consists of constructing a fish passage facility at the Grand Valley <br />Project Diversion Dam located on the Colorado River upstream of the confluence <br />with Plateau Creek. The original plan called for initiating preconstruction activities in <br />FY 1997. However, because of the limited success of the Redlands Fish Passage <br />Facility in 1996, preconstruction activities were delayed pending confirmation of fish <br />use of the Redlands Fish Passage Facility during the summer of 1997. Due to the <br />apparent success of the Redlands Fish Passage Facility as demonstrated by the <br />level of native fish use in August and September of 1997, preconstruction activities <br />are being reinitiated in FY 199B. <br /> <br />IV. Study Schedule: <br /> <br />The current plan is to complete preconstruction activities in FY 1999. Construction <br />of this facility is dependent on availability of capital project funds and successful <br />completion of the GVIC and Price-Stubb fish passage facilities. <br /> <br />V. Relationship to RIPRAP: <br /> <br />Restore fish passage at Government Highline (Roller Dam), Task No.II.B.3 <br /> <br />VI. Accomplishment of FY 97 Tasks and Deliverables, Discussion of Initial Findings and <br />Shortcomings: <br /> <br />FY 1997 Tasks delayed pending confirmation of Redlands Fish Passage Facility <br />success. <br /> <br />VII. Recommendations: <br /> <br />Proceed as outlined above. <br /> <br />VIII. Project Status: <br /> <br />A preconstruction team is being formed to develop conceptual designs and <br />complete NEPA compliance. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.