My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01579
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:44 PM
Creation date
10/11/2006 10:32:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
12/22/1997
Author
UCRBRIP
Title
1997 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY 97 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: CAP-22 <br /> <br />I. Project Title: Hartland Diversion Fish Passage <br /> <br />II. Principal lnvestigator(s): <br /> <br />Brent Uilenberg <br />Bureau of Reclamation <br />P.O. Box 60340 <br />Grand Junction CO B1506 <br />builenberg@ibr8gw8.usbr.gov <br />Phone 970-248-0641 <br />tAX 970-248-0601 <br /> <br />III. Project Summary: <br /> <br />The project consists of constructing a fish passage facility at the <br />Hartland Diversion Dam located on the Gunnison River upstream of the <br />Town of Delta. The original plan called for initiating <br />preconstruction activities in FY 1997 leading to a construction <br />start in FY 199B. However. because of the limited success of the <br />Redlands Fish Passage Facility in FY 1996. preconstruction <br />activities were delayed pending confirmation of fish use of the <br />Redlands Fish Passage Facility during the summer of 1997.The success <br />of the Redlands Fish Passage Facility was subsequently demonstrated <br />by the level of native fish use in August and September of 1997. No <br />funding was programed for preconstruction activities in FY 1998. <br /> <br />IV. Study Schedule: <br /> <br />Unknown at this time pending results of the GVIC Fish Passage <br />Facility and capital project fund availability. <br /> <br />V. Relationship to RIPRAP: <br /> <br />Restore fish passage at Hartland. Task No. II.B.2 <br /> <br />VI. Accomplishment of FY 97 Tasks and Deliverables, Discussion of <br />Initial Findings and Shortcomings: <br /> <br />FY 1997 tasks delayed pending confirmation of Redlands Fish Passage <br />Facility success. <br /> <br />VII, Recommendations: <br /> <br />Proceed as outlined above. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.