My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01579
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:44 PM
Creation date
10/11/2006 10:32:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
12/22/1997
Author
UCRBRIP
Title
1997 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY 97 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: CAP-17 <br /> <br />1. Proiect Title: Fish Passage at the Grand Valley Irrigation Company Diversion Dam. <br /> <br />II. Principallnvestigator(s): Bob Norman & Mike Baker, Bureau of Reclamation <br /> <br />III. Proiect Summary: The goal of this project is to provide fish passage at the Grand <br />Valley Irrigation Company Diversion Dam. In low flow conditions the Grand Valley <br />Irrigation Company Diversion is a barrier to fish movement up the Colorado River. <br />Construction of the passage began in November 1997 and is scheduled to be <br />completed by April 1998. <br /> <br />IV. Study Schedule: <br /> Task 1996 1997 1998 Total <br /> Coordinate 2,000 2,000 <br /> Design 123,000 123,000 <br /> NEPA 100,000 100,000 <br /> Construct 500,000 375,000 875,000 <br /> Operate ??? ?7? <br /> Total $125,000 $600,000 $375,000 $1,100,000 <br /> <br />V. <br /> <br />Relationship to RIPRAP: <br /> <br />Colorado River Action Plan: Mainstem II.B.3. <br /> <br />VI. Accomplishment ofFY 97 Tasks and Deliverables. Discussion ofInitial Findings and <br />Shortcominl!s: <br /> <br />- February 19 - selected conceptual plan from alternatives investigated by Flo <br />Engineering. <br />- May 30 - completed physical model study to assist with design of the proposed <br />fish passage <br />- August 14 - obtained all necessary easements from adjacent landowners <br />- August 21 - environmental assessment finalized and Finding of No Significant <br />Impact signed <br />- September 3 - executed cooperative agreement for construction of the fish <br />passage by the Grand Valley Irrigation Company <br />- September 15 - all necessary permits obtained (Section 404 and 402 of CWA) <br />- October 31 - executed operation and maintenance agreement with Grand Valley <br />Irrigation Company <br />- November 3 - Grand Valley Irrigation Company started construction of fish passage <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.