Laserfiche WebLink
<br />.,~" <br />Upper Gunnison Prc;,','h (continued) <br /> <br />..... <br />r-- <br />U? Water Supply (continued) <br />~ <br /> <br />Tomichi Creek Unit <br /> <br />This unit would develop an irrigation supply of 15,100 acre-feet of <br />water. About 80% of the supply would be used to provide supplemental <br />service to p~esently irrigated lands. <br /> <br />Depletion to the Colorado River would be 4,600 acre-feet. Salinity at <br />Lake Mead is estimated to increase 0.4 milligram per liter as a result <br />of the development. <br /> <br />Irri~able Area <br /> <br />Full service lands (acres) ... . <br />Supplemental service lands (acres) <br />Cost per acre . . . . . . . <br />1/ Since benefit-cost ratio was <br />of costs was made. <br /> <br />Ohio <br />Creek <br />100 <br />6,070 <br />$274 <br />so extremely low, <br /> <br />Unit <br />East Tomichi <br />River Creek <br />150 1,910 <br />o 7,570 <br />$813 1/ <br />no allocation <br /> <br />Agricultural Economy <br /> <br />The principal crops in the areas of all units are meadow hay and pasture. <br />The agricultural economy is based on a livestock operation. Since most <br />of the developed water would be used for supplemental supply, no develop- <br />ment period was contemplated. <br /> <br />The project area is within the Four Corners Administrative Assistance <br />area. <br /> <br />Benefit-Cost Analysis ($1,000) <br /> <br />Ohio Creek Unit <br />Costs <br />Construction cost . . . . . <br />Interest during construction <br />Total . . . <br />Average annual cost . . <br />OM&R . . . . . . . . <br /> <br />. . <br /> <br />. . <br /> <br />. <br /> <br />. <br /> <br /> 4,087 <br /> 259 <br />. 4,346 <br />. 240 <br /> 21 <br />. 7 <br /> 2b8" <br /> 885 <br /> 80 <br /> 36 <br /> 116 <br /> ....21. <br /> 213 <br /> 0.79:1.0 <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. . <br /> <br />. . <br /> <br />. . . <br /> <br />. <br /> <br />. <br /> <br />Share of CRSP costs <br />Total average annual cost <br />Benefits <br />Construction cost of single purpose alternative M&D <br />Annual equivalent cost using 5 1/2% for 20 years . . <br />Operation, maintenance, and replacement ...... <br />Total annual equivalent costs = benefits for M&D water <br />Benefi ts for irrigation . . . .. ..... . <br />Total annual benefits . . . . . . <br />Benefit-cost ratio - total benefits .. . . <br /> <br />. . . <br /> <br />. <br /> <br />. <br /> <br />. . <br /> <br />. <br /> <br />3 <br />