My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01566
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:40 PM
Creation date
10/11/2006 10:32:13 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.300.11
Description
San Juan River Recovery Program - Coordination Committee
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/13/1997
Author
SJRRIP Bio Committee
Title
SJRRIP Seven Year Research Program Draft Budget And Work Plan Fiscal Year 1997
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'38 ,\ <br /> <br />SAN JUAN HABIT AT RESEARCH <br />1997 Work Plan <br />Keller--B1iesner Engineering / Ecosystems Research Institute <br /> <br />DATA INTEGRATION <br /> <br />Background: <br /> <br />Four subcommittees of the biology committee have been fonned for the purpose of data integration and <br />completion offlow recommendations. Keller-B1iesner Engineering and Ecosystems Research Institute are <br />participants on each of these subcommittees. Tasks listed are those required for participation in the <br />integration activities to meet the tnilestones ofthe Long Range Plan scheduled for 1997. <br /> <br />Objectives: <br /> <br />1. Provide Hydro1ogy/GeomOI:phology/Habitat Input to the Integration Process. <br /> <br />Methods: <br /> <br />1. Analvze Hvdrology/Geomorphology/Habitat Data in Relation to Biological Data Sets. (New Task) <br />Inter-relationships between hydrology/geomorphology/habitat and data collected by other <br />researchers will be analyzed. Those potential inter-relationships will be identified in committee. <br /> <br />2. Participate in Committee Meetim!:s to Review and Discuss Integration Issues. (New Task) It is <br />assumed that 2-3 meetings of each subcommittee will be held to discuss results, integrate data and <br />exchange ideas. <br /> <br />Budget (Funded by BIA) <br /> <br />Category <br />Labor <br />Travel, per diem <br />Vehicle/Equipment Use <br />Supplies <br />Overhead <br />TOTAL: <br /> <br />Cost <br />$60,000.00 <br />$9,710.00 <br />$0.00 <br />$900.00 <br />$3.035.00 <br />$73,645.00 <br /> <br />RIVER CHANNEL DYNAMICS <br /> <br />Background: <br /> <br />An understanding of river channel dynamics is the second step (after geomorphic characterization) in <br />development of a river management plan. Understanding the history of channel change in relation to <br /> <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.