Laserfiche WebLink
<br />0\ <br />~-:.,! <br />r-- <br />C-' <br /> <br />~.- <br /> <br />c_ <br /> <br />VIII. <br /> <br />,:.,., <br /> <br />IX. <br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />E. <br />F. <br /> <br />Historical and Archeological Sites . . . . . . . . . . . . <br />Economic Va.lues . . . . . . . _ . . . . . . . . . . . . . . <br /> <br />~ <br />83 <br />83 <br /> <br />84 <br /> <br />ALTERNATIVES TO PROPOSED ACTION <br /> <br />. . <br /> <br />. . . <br /> <br />. . . <br /> <br />. . <br /> <br />. . . <br /> <br />. . <br /> <br />A. Alternative Diversion Points Considered for CAP. . . . . . 84 <br />1. !>Brble Canyon (Verde River) Route . . . . . . . . . . . 84 <br />2. Bridge Canyon (Big Sandy) Route. . . . . . . . . . . . 85 <br />B. Alternatives Considered for Individual Segments of <br />the Feature . . . . . . . . . . . . . . . . . . . . . . . . 85 <br />1. Alternative Routes Considered for the Buckskin <br />MOuntains Area . . . . . . . . . . . . . . . . . . .. 85 <br />a. Alternative Route No.1. . . . . . . . . . . . . . 85 <br />b. Alternative Route No.2. . . . . . . . . . . . . . 86 <br />c. Alternative Route No.3. . . . . . . . . . . . . . 86 <br />d. Alternative Route No.4. . . . . . . . . . . . . . 86 <br />2. Alternatives Considered for the Intake Channel. . .. 86 <br />a. Route A - Intake Channel located llirough <br />Present M:Lrina Cove . . . . . . . . . . . . . . . . 87 <br />b. utilizing Route A and Replacing the !>Brina <br />Facilities . . . . . . . . . . . . . . . . . . .. 87 <br />c. Route B - Open-cut South of !>Brina . . . . . . .. 88 <br />d. Route C - Tunnel South of !>Brina Facilities . . . . 88 <br />e. Route D - Buried Conduit through Peninsula to <br />North Side . . . . . . . . . . . . . . . . . . .. 88 <br />f. Route E - Tunnel on Approxima.tely the Same <br />Alinement as Route D . . . . . . . . . . . . . .. 89 <br />g. Route F - Channel Terminating between Existing <br />Site of Peninsula and Adjacent Island . . . . . . . 89 <br />3. Alternative Pumping Plant and Tunnel Locations <br />and Designs Considered . . . . . . . . . . . . . . .. 89 <br />4. Description of the Present Environment of the <br />Alternatives . . . . . . . . .. .......... 89 <br />5. Impacts of the Alternatives . . . . . . . . . . . . . . 90 <br />C. Alternative Power Sources . . . . . . . . . . . . . . . . . 92 <br />D. No Construction Alternative of the Proposed Action . . .. 93 <br />E. Alternative Water Sources . . . . . . . . . . . . . . . . . 95 <br />1. Use of Recycled Water Produced in the Service Area.. 95 <br />2. Precipitation Management . . . . . . . . . . . . . .. 96 <br />3. Conservation of Irrigation Water . . . . . . . . . .. 97 <br />4. Increased Watershed Runoff . . . . . . . . . . . . . . 98 <br />5. Import from Other Basins . . . . . . . . . . . . . .. 99 <br />6. Geothermal Sources . . . . . . . . . . . . . . . . .. 99 <br />7. ])esalting of Ocean Water. ... ......... 100 <br /> <br />CONSULTATION AND COORDINATION . . <br /> <br />. . . <br /> <br />102 <br /> <br />. . . . . . . . . . . <br /> <br />A. Consultation and Coordination during the Development of <br />the Proposal and during the Preparation of the Draft <br />Environmental Statement . . . . . . . . . . . . . . . . . 102 <br />