Laserfiche WebLink
<br />, <br /> <br />" -"~"'~--"_""'_,_"'-',,-..'.,","_',~ -" ,.,..--~,_.,,_.."~_. "-"..,.,-<.........,.~""', ._'..._........,,~~,i";;;. <br /> <br />~ <br /> <br />, <br />~i <br /> <br />,If':) <br />'cD <br />(oJ <br />C>oJ <br /> <br />Plnn 5 <br /> <br />SUNI'.ARY SIU::1;TS <br /> <br />JanUo'lry 1973 <br /> <br />Ye1 ow Jo'lckeC Project, Coloro'ldo . <br />, <br />I <br />This plo'ln includes the Hilk Creek segment exactly. as planned in the pro- <br />posed feasibility rcport:of Ap.rU 1972. <br />, <br /> <br />The l-1hi tc River segment ho'ls two reservoirs, the Lost Park ReGervoir o'lt the <br />5':"l1e co'lpacity as the feasibility report o'l.1d the Po'''ell Po'lrk Reservoir on <br />the White River below Meeker, Color~do. <br /> <br />Releases. from Lost Purk. Reservoir pl1;S the n::lturo'll flows of the l-1hite River. <br />within the limit.atians of the Claxi:cunl and minimum requir=ents called for <br />by the Colorado Wildlife Commission, would be diverted fran the Whi te River <br />at approximately the same point as in the present plan. The Yellow Jo'lcket <br />Canal would be buried pipe to Coal Creek. A short lateral would divert <br />from the Yellow Jacket Canal to irrigate the south side of Little Beaver <br />Basin. <br /> <br />Municipal and industrial water requirements in the Piceo'lnce Creek Bo'lsin <br />would be supplied by pumping from the potential Powell Park Reservoir. <br /> <br />WATER SUPPLY (average acre-feet annually)' <br /> <br />Project water supply at points of diversion <br />Industrial, municipal, and domestic use . . . . . . . <br />Irrigatiun . . . . . . . . . . . . . . . . . . . . . <br />To tal ..................... <br />Depletion of Coloro'ldo River .............. <br /> <br />. . . <br /> <br />. . . <br /> <br />. . . <br /> <br />. . . <br /> <br />IRRIGATION SERVICE ARZ~ (acres) <br /> <br />Full service <br />Supplemental <br />Total . <br /> <br />land (now cultivated) <br />service land ..... <br /> <br />. . . . . . . <br /> <br />. . <br /> <br />. . . . <br /> <br />. . . . . . . <br /> <br />. . <br /> <br />. . . . <br /> <br />. . . . . . . . . . . . . . . . . . . . . . . . . <br /> <br />PROJECT FEATURES <br /> <br /> Thorn- <br /> Lost ParI< burRh <br />Reservoirs <br />Capacity (acre-feet) <br /> Active 22,000 16,535 <br /> Dead and inactive 2,500 6,001 <br /> Total 24,500 22,536 <br />Normal water surface area <br /> (acres) 581 605 <br />Dams <br />Height (feet) 114 115 <br />Crest length (feet) 1,160 700 <br /> Yellow Josephine <br />Canals .Jacket Basin <br />Length (miles) 31 T <br />- . . <br /> <br />71,500 <br />21.200 <br />92,700 <br />74,900 <br /> <br />7,900 <br />3,140 <br />11,040 <br /> <br />Powe 11 <br />Park <br /> <br />37,000 <br />3,000 <br />40,000 <br /> <br />975 <br /> <br />117 <br />2,190 <br /> <br />Nilk <br />Crc"k <br />12 <br />