<br />PROPOSED BUDGET
<br />BUDGET ADOPTED
<br />Fiscal Year July 1, 1981 through JW1e 30,1982
<br />
<br />Personal Services .
<br />Secretary's Salary. .
<br />Social Security,
<br />Professional Services
<br />
<br />,$ 4,150,00
<br />
<br />, ,$ 3,600,00
<br />230,00
<br />920,00
<br />
<br />U ,S, Geological Survey, ,
<br />Cooperative Agreement
<br />Telemark .
<br />
<br />"'," ,$ 5,750,00
<br />,$ 4,900,00
<br />850,00
<br />
<br />Data Acquisition Improvement Plan.
<br />
<br />"," ,$ 5,000,00
<br />
<br />Maintenance and Operation .
<br />Treasurer's Bond.
<br />Printing.
<br />Telephone,
<br />Office Expense,
<br />Travel and Meetings
<br />
<br />........ $ 5,190,00
<br />",$ 90.00
<br />1,250.00
<br />2,000,00
<br />500,00
<br />1,350,00
<br />
<br />Contingency. .
<br />
<br />, , , , , , , ,$ 2,000.00
<br />
<br />TOTAL BUDGET 1980.1981 '
<br />
<br />, $22,690,00
<br />
<br />To be appropriated,
<br />Colorado (60%1, '
<br />Kan.as (40%)
<br />
<br />, ,$22,690,00
<br />
<br />"'," ,$13,614,00
<br />, ,$ 9,076,00
<br />
<br />6, Facts about John Martin Project:
<br />
<br />The John Martin Reservoir Project was built by the Corps of
<br />Engineers. United Stales Army. The project was authorized by
<br />Congress in the Flood Control Act of JW1e 22, 1936, when the federal
<br />responsibility for flood control throughout the cOlUltry was assigned to
<br />the Corps of Engineers. it is located on the Arkansas River, 58 miles
<br />upstream from the Colorado.Kansas stateline and 18 miles upstream
<br />from the city of Lamar, Colorado. Construction of the project began in
<br />the fall of 1939. but work was suspended by World War 11 from the
<br />spring of 1943 to the spring of 1946. The project was completed in
<br />October 1948 at a cost 01 ahout $15 million, The War Department Civil
<br />Appropriation Act of June 24, 1940, changed the name of the project
<br />from Caddoa Reservoir Project to John Martin Reservoir Project, in
<br />honor of the late Congressman John A. Martin of Colorado. It is
<br />operated by the United States Army Engineer District, Albuquerque,
<br />New Mexico. Mr. Russell Smith has been the resident superintendent of
<br />the project since October, 1976.
<br />The John Martin Reservoir Project is part of the comprehensive
<br />plan for the control of floods and the development of the water
<br />resources of the entire Arkansas River basin. The reservoir provides
<br />270,375 aCTE'-Ieet of storage capacity for flood control. It protects the
<br />lertile Arkansas River Valley below the dam from floods originating in
<br />the 18,915 square miles of the Arkansas River basin above the dam, It
<br />provides 350.951 acre-feet of storage space for conservation and
<br />
<br />-6-
<br />
|