Laserfiche WebLink
<br />PROPOSED BUDGET <br />BUDGET ADOPTED <br />Fiscal Year July 1, 1981 through JW1e 30,1982 <br /> <br />Personal Services . <br />Secretary's Salary. . <br />Social Security, <br />Professional Services <br /> <br />,$ 4,150,00 <br /> <br />, ,$ 3,600,00 <br />230,00 <br />920,00 <br /> <br />U ,S, Geological Survey, , <br />Cooperative Agreement <br />Telemark . <br /> <br />"'," ,$ 5,750,00 <br />,$ 4,900,00 <br />850,00 <br /> <br />Data Acquisition Improvement Plan. <br /> <br />"," ,$ 5,000,00 <br /> <br />Maintenance and Operation . <br />Treasurer's Bond. <br />Printing. <br />Telephone, <br />Office Expense, <br />Travel and Meetings <br /> <br />........ $ 5,190,00 <br />",$ 90.00 <br />1,250.00 <br />2,000,00 <br />500,00 <br />1,350,00 <br /> <br />Contingency. . <br /> <br />, , , , , , , ,$ 2,000.00 <br /> <br />TOTAL BUDGET 1980.1981 ' <br /> <br />, $22,690,00 <br /> <br />To be appropriated, <br />Colorado (60%1, ' <br />Kan.as (40%) <br /> <br />, ,$22,690,00 <br /> <br />"'," ,$13,614,00 <br />, ,$ 9,076,00 <br /> <br />6, Facts about John Martin Project: <br /> <br />The John Martin Reservoir Project was built by the Corps of <br />Engineers. United Stales Army. The project was authorized by <br />Congress in the Flood Control Act of JW1e 22, 1936, when the federal <br />responsibility for flood control throughout the cOlUltry was assigned to <br />the Corps of Engineers. it is located on the Arkansas River, 58 miles <br />upstream from the Colorado.Kansas stateline and 18 miles upstream <br />from the city of Lamar, Colorado. Construction of the project began in <br />the fall of 1939. but work was suspended by World War 11 from the <br />spring of 1943 to the spring of 1946. The project was completed in <br />October 1948 at a cost 01 ahout $15 million, The War Department Civil <br />Appropriation Act of June 24, 1940, changed the name of the project <br />from Caddoa Reservoir Project to John Martin Reservoir Project, in <br />honor of the late Congressman John A. Martin of Colorado. It is <br />operated by the United States Army Engineer District, Albuquerque, <br />New Mexico. Mr. Russell Smith has been the resident superintendent of <br />the project since October, 1976. <br />The John Martin Reservoir Project is part of the comprehensive <br />plan for the control of floods and the development of the water <br />resources of the entire Arkansas River basin. The reservoir provides <br />270,375 aCTE'-Ieet of storage capacity for flood control. It protects the <br />lertile Arkansas River Valley below the dam from floods originating in <br />the 18,915 square miles of the Arkansas River basin above the dam, It <br />provides 350.951 acre-feet of storage space for conservation and <br /> <br />-6- <br />