My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01498
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01498
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:19 PM
Creation date
10/11/2006 10:29:15 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1981
Author
BOR
Title
Animas-La Plata Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />,. <br /> <br />. <br /> <br />-- <br /> <br />~" <br />~~}) <br /> <br />'. . ~~\';--~ <br /> <br />j.... ~" ''''. <br />! . -~-'~-. <br />~ .. . <br /> <br />. <br />~, <br />'",;;1 <br /> <br />'. ' <br />.. a.M <br />Artist's concept of Ridges Basin Dam and Reservoir. <br /> <br />will convey water diverted from the river by the <br />Southern Ute Diversion Dam for the irrigation <br />of land in New Mexico. Sprinkler irrigation will <br />be provided by pressure developed through <br />gravity pipe laterals and, on one lateral system, <br />a pumping plant. A total of 42,800 acres of full <br />and supplemental service land will be irrigated <br />under Phase 1. Preconstruct ion activities began <br />in 1986 as a prelude to the first major construc- <br />tion activity in 1988. Phase 1 is scheduled to be <br />completed in approximately 12 years. <br />Under Phase 2, water will be diverted from the <br />La Plata River to the Dry Side Canal by the La <br />Plata Diversion Dam during spring runoff. The <br />Southern Ute Diversion Dam and Inlet Canal will <br />convey water to Southern Ute Reservoir near <br />the Colorado-New Mexico State line. This off- <br />. stream reservoir will store water for the Southern <br />:\ Ute Indian Tribe for coal resource development <br />J and for New Mexico irrigation. New Mexico <br />Irrigation Canal will carry water released from <br /> <br />. <br /> <br />.-. <br /> <br />the reservoir to land in New Mexico. Under <br />Phase 2. these additional features will be <br />developed: approximately 2 miles of the Dry <br />Side Canal and 4 pumping plants and pipe <br />laterals to serve approximately 24.600 acres of <br />land in Colorado and New MeXICO. <br /> <br />Economic Base <br /> <br />The project will affect the people and economy <br />of La Plata County. Colorado, and San Juan <br />County. New Mexico, by having beneficial <br />influences on jODS. agriculture, and recreation. <br />During the peak year of construction on Phase 1. <br />the construction-related population influx into <br />the project area will total approximately 1.200 <br />people: construction workers and families. <br />On completion of Phase 1, a total of approx- <br />imately 110 jobs will be created in both <br />agriculture and related businesses, including <br />almost 40 new on-farm jobs in the two counties, <br />
The URL can be used to link to this page
Your browser does not support the video tag.