Laserfiche WebLink
<br />.COLORADO RIVER STORAGE PROJECT <br /> <br />7 <br /> <br />The following tabulation shows the circuit miles of transmission <br />lines in service as of Jime 30, 1966: : <br /> <br />345' kilovolts_ _ _ _ _ _ _ _ _ _ _ _. __ _'_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _~ _ _, '_' <br />230'kilovolts_ _ _ _ _ _ _ __ _ _ n _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _'_ _ _..: _ __ _..:__ <br />138 kilovolts, n n, _ _ _" n, n n n _ _ _ _ _ n, n n n _ _ ~ n n, _ _ _ _ u, _ _, . <br />115 kilovoltsu ___ __ __ __-"'n ~___ ___ __"'-_ __-'__ n__ _ _J__u_,__.__ n__:_~ <br /> <br />352. I <br />611. 3 <br />315. 7 <br />II 6. 9 <br /> <br />TotaL" un n n___n n_'_ ,_ _________ __ _'_~~n'_n___'_:, 1,396. 0 <br /> <br />There were nine substations in service with a total capacity of <br />3,434,124 kilovolt-amperes. . , : . " <br /> <br />BOSTWICK PA~K PARTICIPATING PROJECT, COLORADO <br /> <br />. . <br />This multipurpose project is located in west-central Colqrado in <br />Gunnison and Montrose Counties near the city of Mon~rose. The <br />project will provide a full water supply to 1,610 acres. Existing <br />laterals will provide. ~ supplemental supply, to 4,500 acres. The <br />project will also provide benefits to fish, wildlife,and recreation. <br />An $859,000 repayment contract betwee.nthe Bureau of Reclama- <br />tion and the Bostwick Park Water Conservancy District was executed <br />on March 18, 1966, and validated on May 3, 1966. The definite <br />plan report was approved by the Commissioner on March 1, 1966. <br />Storage regulation of flows of Cimarron Creek will be provided by <br />the Silver Jack Dam, principal feature of the project. Released stor- <br />age 'water and usable :natmal flows will be diverted from Cimarr.on <br />Creek into the existing Cirnarron Canal and conveyed 23 miles to the <br />vicinity of the project lands where distribution will be made through <br />existing ditches. Two laterals will be constructed .to,conyey water t<i> <br />lands above those presimtly irrigated. '. ' <br />Preconstruction work included the awarding of a contract for the <br />exploration of a borrow area to be used in the construction .of -Silver <br />Jack Dam. The actual award of contract to construct the dam is <br />expected to be announced early. in fiscal year 1967. When com- <br />pleted, the Silver Jack Dam will have an earthfill embankment to <br />rise'138 feet above the stream bed with a crest length of 1,070 feet. <br />Its reservoir will have'a total capacity of 13,520 acre-feet. <br /> <br />CENTRAL UTAH PARTICIPATING' PROJECT, .-~ONNEVILLE UN!:, UTAH <br /> <br />The Bonneville unit is a part of the initial phase of the central . <br />Utah project. It is looatedin central Utah in the ,eastern part of the <br />Bonneville Basin and in th~ western part ofUiIita Basin in Dint.ah, <br />Duchesne, Wasatch, SummIt, Utah, Salt Lake,and Juab,Cbuntles, <br />Utah. The unit is multipurpose in scope. It will provide a full <br />water supply for. the irrigation of 43,740 acres.of additional land, a <br />supplemental water supply to 112,790 acres of partically irrigated <br />lands, 79;000 acre-feet of water annually for municipal use, and 133,500 <br />kilowatts of installed cdpacity for the generation of power, to be used <br />for u.'rigation pumping and for commercial sale,' Benefits to fish and <br />wildlife,recreation, and flood control will also be provided. ,] <br />Work accomplishment during fiscal year 1966 consisted mainly f@j' <br />construction on the Duchesne government community. 'Thestrelfti; <br />were roughed out and excavation for much of the sewer and water <br />lines was completed. As of June 30, 1966, about 61 percent of plll'Jo~ <br />O,1JO:) <br />lj,tmrIf <br />MUO <br /> <br />