Laserfiche WebLink
<br />::'JGS <br /> Non-Federal Sub- <br /> Federal Cost Cost Total Total <br />ROCK CREEK <br />DEVELOPED AREA <br />Roads and Trails <br />Main Access Road $ 135,000 $ <br />(1.25 Mi.,two-way) <br />Campground Circulatory Roads 35,000 <br />(0.75 Mi.) <br />Trailer Village Parking (60) 40,000 <br />Parking (60 cars) 25,000 <br />Stable Parking (70 cars) 30,000 <br />Shooting Range Parking (60) 25,000 <br />Trails (0.5 Mi.) 8,000 <br />Horse Trail (18 Mi.) 180,000 <br /> $ 315,000 $ 163,000 $ 478,000 <br />Buildings <br />Camper Store Building $ 20,000 <br />Laundry, Shower Building 28,000 <br />Comfort Stations (9) 72,000 <br />Stable Barn 20,000 <br /> $ 140,000 $ 140,000 <br />Utilities <br />Water System $ 110,000 <br />Sewerage System 100,000 <br />Power System 30,000 <br />Telephone System 5,000 <br /> $ 245,000 $ 245,000 <br />l"dscellaneous <br />Shooting Range $ 30,000 <br />Campsites (180) 10,000 <br />Ground Improvement 25,000 <br />Irrigation System 40,000 <br />Playfield 20,000 <br />Signs 4,000 <br /> $ 129,000 $ 129,000 <br />Rock Creek Developed <br />Area Total $ 315,000 $ 677,000 $992,000 <br /> <br />13. <br />