Laserfiche WebLink
<br />C) <br />C) <br />...... <br />(.O <br />...... <br />w <br /> <br />25 <br /> <br /> <br />() <br />~ 20 <br />~ <br />0> <br />Q) <br />'0 <br />, <br />0. 15 <br />E <br />~ <br />~ <br />Q) <br />~ 10 <br />"" <br />'(ii <br />Cl <br />:Ii 5 <br />Q) <br />::< <br /> <br />o <br />10/01 <br /> <br />12/01 <br /> <br />01/31 <br /> <br />04/01 <br />Date <br /> <br />06/01 <br /> <br />08/01 <br /> <br />10/01 <br /> <br />- Shiprock 1951-1961 <br /> <br />- Shiprock 1964-1986 <br /> <br />- Projected Shiprock 1993-98 <br /> <br />Figure 3.18. Seven-day running mean daily water temperature for the San Juan River at <br />Shiprock, New Mexico, during pre-dam, post-dam, and research flow periods <br />(Source: Bliesner and Lamarra 2000). <br /> <br />Colorado pikeminnow are known to spawn later in high-flow years when water temperatures are cooler <br />(Trammell and Chart 1999, Tranunell et al. 1999), and recent studies in the Yampa River found that <br />spawning may be initiated at temperatures of only 160C during some years (Bestgen et al. 1998). It is not <br />known what effect later spawning may have on Colorado pikeminnow, although it would provide less time <br />for YOY to grow during the autumn. Some authors suggested that smaller Colorado pikeminnow are less <br />likely to survive the winter (Haines and Tyus 1990, Bestgen et aI.I998), which may be a major factor in <br />recruitment. Delaying Colorado pikeminnow spawning in the San Juan River also has the potential to place <br />larvae in the rivernear the time ofIate sununer thunderstorm flooding, Platauia et al. (2000) calculated time <br />of spawning for young Colorado pikeminnow collected from the San Juan River during the 7 -year research <br />period, and most spawning dates were in mid to late July on the descending limb of the hydrograph, the <br />typical time for this species to spawn. This suggests that spawning of the existing wild population is not <br />delayed because of cooler temperatures, <br /> <br />September 2000 <br /> <br />3-41 <br /> <br />Program Evaluation Report <br />