Laserfiche WebLink
<br />(-~~,:;t) <br /> <br />\~~:~J <br /> <br />New studies would be submitted to the Flaming Gorge team by April of the <br />preceding year to be prioritized. <br /> <br />IX. Budqet Summarv <br /> <br />FY-1992 - A summary budget by agency for FY-92 is shown in Table 1. <br />Total expenditures for the fiscal 'ear would total $363,600 (not <br />including FWS overhead). Total budget :or the fiscal year with overhead <br />totals $382,100. In addition, $90,600 (including FWS overhead) has been <br />budgeted separately for the Old Charley Wash wetlands <br />restoration/demonstration project. <br /> <br />FY-1993 - (Estimated)- SDCR:$175,000 Hypothesis Testing:$200,000 <br />FY-1994 - (Estimated)- SDCR:$175,000 Hypothesis Testing:$200,000 <br />FY-1995 - (Estimated)- SDCR:$175,000 Hypothesis Testing:$200,000 <br /> <br />5 <br />