My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01441
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:01 PM
Creation date
10/11/2006 10:24:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
12/1/1971
Author
Missouri Basin Inter
Title
Missouri River Basin Comprehensive Framework Study-Volume VII-Plan of Development and Management-Appendix
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\.l,j <br /> <br />CONTENTS (Continued) <br /> <br />IMPACTS OF WATER SUPPL Y CHANGE <br />Water Availabihty and Use . . . . <br />Effect" on the Missouri River. . . . . . <br />FUTURE DEVELOPMENTS ON THE MISSOURI RIVER <br />THE BASIN PLAN . . . . . . . <br />CHAPTER 8 - ASSESSMENT OF FRAMEWORK PLAN RESPONSES TO NEEDS <br />RESPONSES TO FUNCTIONAL NEEDS <br />Flood Control <br />Erosion Control <br />Lmd Conservation <br />Group Drainage Systems <br />Irrigauon . . . . <br />Fish and Wildlife. <br />Outdoor Recreation <br />Electric Power ... <br />Water Supplv and Treatment <br />WaterOualitv <br />Added Water Yield Management <br />RELATIONSHIP OF FRAMEWORK PLAN FEATURES TO PLANNING OBJECTIVES <br />Agricultural Production <br />Other Industrial <br />Navigation ... <br />The Environment <br />Impacts. . <br /> <br />Page <br />.196 <br />.197 <br />.199 <br />.200 <br />.202 <br /> <br />.205 <br />.205 <br />.205 <br />.208 <br />.208 <br />.210 <br />.211 <br />.213 <br />.215 <br />.217 <br />.217 <br />.217 <br />.220 <br />.223 <br />.223 <br />.224 <br />.224 <br />.224 <br />.225 <br /> <br />.227 <br />.227 <br />.227 <br />.233 <br />.235 <br />.235 <br />.236 <br />.236 <br />.236 <br />.238 <br />.238 <br />.238 <br />.240 <br />-241 <br />.241 <br />.242 <br />-242 <br />-242 <br />.243 <br /> <br />. S.l <br />.S.2 <br /> <br />CHAPTER 9 ~ FRAMEWORK PLAN IMPLEMENTATION <br />ECONOMIC PROJECTIONS <br />PLANNING AND TIME CONSTRAINTS <br />FISCAL CONSTRAINTS . . . . <br />PROGRAMMING PLAN FEATURES <br />UPPER MISSOURI SUBBASIN <br />YELLOWSTONE SUBBASIN . . <br />WESTERN DAKOTA SUBBASIN <br />EASTERN DAKOTA SUBBASIN <br />PLATTE.NIOBRARA SUBBASIN <br />MIDDLE MISSOURI SUBBASIN <br />KANSAS SUBBASIN . <br />LOWER MISSOURI SUBBASIN <br />MISSOURI RIVER BASIN <br />SUMMARY .... ...... <br />OTHER PLAN IMPLEMENTATION CONSIDERATIONS <br />Institutiona! Arrangements <br />PolicV Considerations ..... <br />Legal Considerations . . . . . . . <br /> <br />COST DISTRIBUTION SUPPLEMENT <br />FUNCTIONAL COST DISTRIBUTION - EIGHT SUBBASINS AND THE MISSOURI BASIN <br />INITIAL INVESTMENT COST DISTRIBUTION SUMMARIES ~ EIGHT SUBBASINS <br />AND MISSOURI BASIN . . . . . . . . . . .. ....... <br />EXAMPLE OF MULTIPURPOSE RESERVOIR COST ALLOCATION. . <br />SUMMARY OF INITIAL INVESTMENTS AND ANNUAL OPERATION. MAINTENANCE. AND <br />REPLACEMENT COSTS - EIGHT SUBBASINS AND MISSOURI BASIN .. . . <br />ANNUAL OPERATION, MAINTENANCE. AND REPLACEMENT COST _ DISTRIBUTION <br />SUMMARY - MISSOURI BASIN ........ ........ <br /> <br />.S.3 <br />S.30 <br /> <br />S.31 <br /> <br />S.32 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.