My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01441
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:01 PM
Creation date
10/11/2006 10:24:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
12/1/1971
Author
Missouri Basin Inter
Title
Missouri River Basin Comprehensive Framework Study-Volume VII-Plan of Development and Management-Appendix
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONTENTS (Continued) <br /> <br />Number Page <br />83 Water Control and Related Land Development, Framework Plan - Kansas Subbasin . . . . . . . . . . . . . .173 <br />84 Environmental Enhancement and Non-Structural Measures, Framework Plan - <br />Kansas Subbasin .......................... . . . . . . . .175 <br />85 Land Use Changes, Framework Plan - Kansas Subbasin .............. .175 <br />86 Water Withdrawals, Depletions, and Other Changes, Framework Plan - Kansas Subbasin .176 <br />87 Initial Investment Cost Distribution Summary - Kansas Subbasin .177 <br />88 Framework Plan for 1980 - Kansas Subbasin. . . . . . . . . . . . . . . . . .182 <br />89 Existing Flood and Erosion Control Projects - Lower Missouri Subbasin . . . .186 <br />90 Specified Non-Federal Programs and Modifications of Existing Developments, <br />Framework Plan - Lower Missouri Subbasin ....................... .189 <br />91 Water Control and Related Land Development, Framework Plan - Lower Missouri Subbasin .190 <br />92 Environmental Enhancement and Non-Structural Measures, Framework Plan - <br />Lower Missouri Subbasin. . . . . . . . . . . . . . . . . . . . . . . .190 <br />93 Land Use Changes, Framework Plan - Lower Missouri Subbasin . . . . .191 <br />94 Water Withdrawals, Depletions, and Other Changes, Framework Plan - <br />Lower Missouri Subbasin . . . . . . . . . . . . . . . . . . . . . . . .191 <br />95 Initial Investment Cost Distribution Summary - Lower Missouri Subbasin .192 <br />96 Framework Plan for 1980 - Lower Missouri Subbasin .......... .193 <br />97 Land Use Changes, Framework Plan - Missouri River Basin ....... .197 <br />98 Water Withdrawals, Depletions, and other Changes, Framework Plan - Missouri River Basin .199 <br />99 Effects on Navigation Season Lengths by Future Basin Development .200 <br />100 Features for Framework Plan - Missouri Basin . . . . . . . . . . . . . . . .203 <br />101 Initial Investment Cost Distribution Summary - Missouri Basin ...... .204 <br />102 Flood Control Response from Subbasin Framework Plans - Missouri Basin .206 <br />103 Streambank and Gully Erosion Response from Subbasin Framework Plans - Missouri Basin .209 <br />104 Land Conservation Response from Subbasin Framework Plans - Missouri Basin . . . .210 <br />105 Group Drainage Systems Response from Subbasin Framework Plans - Missouri Basin .211 <br />106 Irrigation Development Response from Subbasin Framework Plans - Missouri Basin .212 <br />107 Fish and Wildlife Response from Subbasin Framework Plans - Missouri Basin .. .214 <br />108 Outdoor Recreation Response from Subbasin Framework Plans - Missouri Basin .216 <br />109 Other Environmental Enhancement Responses from Subbasin Framework Plans- <br /> <br />~v~isscuri Basin <br /> <br />.217 <br />.218 <br />.218 <br />.219 <br />.222 <br />.223 <br />.227 <br /> <br />120 <br /> <br />Electric Power Response from Subbasin Framework Plans - Missouri Basin <br />Water Supply Response from Subbasin Framework Plans - Missouri Basin . <br />Water Quality Response from Subbasin Framework Plans - Missouri Basin <br />Added Water Yield Management Response from Subbasin Framework Plans - Missouri Basin <br />Agricultural Production Capability from Missouri Basin Framework Plan . . . . . <br />Population and Total Personal I ncome Differences from Original Projections . . . <br />Feasibility Reports Completed or Required to I mplement Federal Water Projects <br />in 1980 Framework Plan . . . . . . . . . . . . . . . . . . . . . . . . . ., .............. <br />Specified Federal Agencies Study Program and I nvestments as Related to 1980 <br />Framework Plan and as Constrained by Physical Factors .......... <br />Cost Summary, Framework Plan - Missouri Basin . . . . . . . . . . <br />Analysis of Federal Water Project I nvestment Requirements for Implementation <br />of 1980 Framework Plan . . . . . . . . . . . . . . . . . . . . . . . . <br />Analysis of Federal Water Project I nvestments with Fiscal Constraints for <br />1970-1980,1980 Framework Plan . . . . . . . . . . . . . . . <br />Programmed Framework Plan for 1980, Upper Missouri Subbasin <br />Programmed Framework Plan for 1980, Yellowstone Subbasin . . <br />Programmed Framework Plan for 1980, Western Dakota Subbasin <br />Programmed Framework Plan for 1980, Eastern Dakota Subbasin <br />Programmed Framework Plan for 1980, Platte-Niobrara Subbasin <br />Programmed Framework Plan for 1980, Middle Missouri Subbasin <br /> <br />.232 <br /> <br />110 <br />111 <br />112 <br />113 <br />114 <br />115 <br />116 <br /> <br />117 <br /> <br />118 <br />119 <br /> <br />.233 <br />.233 <br /> <br />.234 <br /> <br />121 <br />122 <br />123 <br />124 <br />125 <br />126 <br /> <br />.235 <br />.236 <br />.237 <br />.237 <br />.238 <br />.239 <br />.239 <br /> <br />viii <br />
The URL can be used to link to this page
Your browser does not support the video tag.