My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01434
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:30:59 PM
Creation date
10/11/2006 10:24:37 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8221.103
Description
Middle Park Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/2/1964
Title
CWCB: Agenda Item #5 Priority Schedule - Colorado River Storage Project Board Meeting March 11 1964
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />" <br /> <br />It may be that by eliminating the overall comprehensive <br />plan that a more favorable plan could be developed solely as a <br />Colorado project. Consideration should be also given to either <br />the elimination or improvement of the power features, since these <br />features contribute nothing to the project repayment other than to <br />power itself. <br /> <br />I I:"- <br />C"J <br />c: <br />- <br /> <br />c. <br /> <br />In attempting to arrive at a priority for the Juniper Proj- <br />ect we have evaluated it in connection with the other projects in <br />the Yampa Valley, as follows: <br /> <br />Great Northern <br />and Yampa Valley <br /> <br />Juniper <br />(initial phase) <br /> <br />Estimated cost: $25,750,000 <br /> <br />$30,328,000 <br /> <br />Irrigated acreage: 61,895 acres <br /> <br />9,000 acres <br /> <br />Cost per acre: $396. <br /> <br />$911. <br /> <br />Average annual stream depletion <br />per acre of irrigated land: 1.25 a.f. <br /> <br />5.39 a.f. <br /> <br />Benefit-cost ratio: 1.05 to I <br /> <br />1.62 to I <br /> <br />As can be seen from the above summary, the projects in the <br />upper Yampa will develop almost seven times the irrigated acreage <br />of the Juniper Project, at less than the total cost of the Juniper <br />Project. The development cost per acre is less than half of the <br />Juniper development cost and the consumptive use of water per acre <br />is only about 25% of the consumptive use under the Juniper Project. <br />Although the Juniper Project shows a more favorable benefit-cost <br />ratio, a more disadvantageous method was used in computing the ratio <br /> <br />for the upper Yampa projects. <br /> <br />Based on the available information, we can only come to the <br />conclusion that the economy of the Yampa Valley can best be devel- <br />oped by giving early priorities to those projects in the upper en~ <br />of the valley. People already reside under the proposed projects <br />there, and we feel that they should have first consideration in <br />preference to the development of wholly new farm units under the <br />Juniper Project. Admittedly, however, the recreational benefits <br />attributable to the Juniper Project might outweigh land development <br />considerations. <br /> <br />Juniper Project <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.