Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />l!':' <br />N <br />c <br />... <br /> <br />NO. 5 <br /> <br />JUNIPER PROJECT <br /> <br />c, <br /> <br />I. Location and water source: West of Craig, Colorado. (Moffat <br />County). Yampa River. <br /> <br />2. Estimated cost: Xnitial Phase Final Phase <br /> <br />Irrigation <br />Power <br />Other <br /> <br />$ 8,195,000 <br />16,593.000 <br />5,540,000 <br /> <br />$119,842,000 <br />l6,048,OOO <br />9,674.000 <br /> <br />Total <br /> <br />$30,328,000 <br /> <br />$l45,564,OOO <br /> <br />3. Irrigated acreage: <br />Colorado <br />Utah <br /> <br />9,000 <br />None <br /> <br />32.000 <br />68,000 <br /> <br />Total <br /> <br />9.000 <br /> <br />100,000 <br /> <br />4. Cost per acre: <br />Irrigation cost alloca- <br />tion only <br />Irrigation and power <br /> <br />$ 911. <br />2754. <br /> <br />$ 1198. <br />1359. <br /> <br />*5. Average annual stream depletion: <br />(Colorado) <br /> <br />"18,500 a.f. <br /> <br />75,000 a.f. <br /> <br />*6. Average annual stream depletion per <br />acre of irrigated land (Colorado) <br /> <br />5.39 a.f. <br /> <br />2.34 a.f. <br /> <br />7. Installed generating capacity: <br /> <br />30,000 kw <br /> <br />30,000 kw <br /> <br />8. Time required for power repayment: <br /> <br />47 years <br /> <br />88 years <br /> <br />9. Benefit-cost ratio: <br />Direct <br />Direct and indirect <br /> <br />1.38 to I <br />1.62 to I <br /> <br />0.92 to I <br />1.54 to I <br /> <br />*Includes reservoir evaporation and diversions less returns. <br /> <br />The foregoing summary is based upon reconnaissance data com- <br />pleted in 1963. The information is therefore completely current. <br />The 1963 report is essentially the same as the report dated Febru- <br />ary 1957. Detailed land classifications are expected to reduce the <br />amount of irrigable lands by a significant amount. <br />