My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01413
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:30:53 PM
Creation date
10/11/2006 10:22:55 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.122.A
Description
Paonia Project
State
CO
Basin
Gunnison
Water Division
4
Date
6/12/1947
Title
Paonia Project Colorado (Senate Document No. 61)
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />24 <br /> <br />PAONIA PROJECT, COLORADO <br />, <br /> <br />area before collection of construction repayment charges. However, <br />approximately 2,000 acre-feet of the 6;000 acre-feet of fully useful <br />project water, made available to the Leroux Creek lands by exchange, <br />is obtained from a number of existing small reservoirs. Effective use <br />of this 2,000 acre-feet of project water depends on the successful opera- <br />. tion of these reservoirs which are now in a poor state of repair and in <br />need of rehabilitation. Inasmuch as the needed work can well be <br />handled by the Leroux Creek water users after delivery of project <br />water, the deferment of construction repayment charges for a period <br />of not more than 10 years is suggested, provided that after a 3-year <br />development period funds equal in amount to repayment charges .be <br />assessed project water users of Leroux Creek and spent on reservoir <br />rehabilitation work. In the event the rehabilitation work does no.t <br />require an expenditure of money equal to the repayment charges over <br />the 7 year period, repayment to the United States is to be initiated <br />at such time as the rehabilitation work is complete. <br /> <br />o <br />
The URL can be used to link to this page
Your browser does not support the video tag.