Laserfiche WebLink
<br />6 <br /> <br />CRBSCP and CRWQIP <br /> <br />dikes, pipelines. pumps., desahers. and e\:aporalion ponds <br />to ('o(fect and dispose of saline water. <br /> <br />BENEFITS <br /> <br />rmplementation of aU salinity control units under Title <br />II would reduce the salinity of the Colorado River at <br />Imperial Dam by obaul 185 port. per million. The <br />fumullllive impact of the four authorized salinit), control <br /> <br />units will pro'o'ide an initial reduction of about 67 paTlS <br />per million. Annuall)', the estimated reductions will total <br />aLout ].9 miHiolJ tons of sah removed from the river <br />,y.tem for full program implemenlolion, and 670,000 <br />tons for the authorized control units. The benefil'ial <br />impact~ of ~Ii{\ity r1eduction ",,'ill be reflected in all the <br />Basin States in imprO\'ed water quality deli,,'eries to O\'er <br />]8 million peoplto and more than I million ac.ra;. of <br />irrigated farmland. <br /> <br />tI u.s. GOVERNMENT PRINTING OFFICE: 1964-776 _6jZ <br />