My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01353
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:30:38 PM
Creation date
10/11/2006 10:20:38 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400.20
Description
Colorado Big Thompson Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
6/1/1952
Author
US DOI/BOR
Title
Colorado-Big Thompson Project -- Definite Plan Report -- Volume 1
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />July 1952 <br /> <br /> <br />o <br />o <br />(~ <br />..:::. <br />c.n <br />0'.) <br /> <br />COLOR.i\DQ..BIG THOMPSON PROJECT <br /> <br />ADDENDUM NO. 1 <br /> <br />to <br /> <br />Summary Sheets <br /> <br />Subsequent to preparation of this report, the Commissioner of <br />the Bureau of Reclamation recommended to the Secretary of the Interior <br />in a memorandum dated June 26, 1952, that the second Flatiron-Leyner <br />transmission line not be constructed and in lieu thereof that a line <br />from Flatiron to Valmontwith terminal facilities at Flatiron be <br />included in the 1954 budget. Either of the above lines provides the <br />interconnection necessary for integrated operation of the Colorado- <br />Big Thompson system with that of the Public Service company. <br /> <br />:1 <br /> <br />The substitution of lines changes the estimated cost of the <br />project on the Official Estimate, PF-l, as follows: <br /> <br />Account Number Item Cost <br />Delete: <br /> 13.106 Flatiron-Leyner No. 2 <br /> 115 Kv line $277,000 <br /> 13.64 LeynerSubstation 137,000 <br /> Total $414,000 <br />Add: <br />- 13.136 Flatiron-Valmont line $408,000 <br /> 13.137 Flatiron Metering Station 31,000 <br /> Total $439,000 <br /> ,," '; <br /> Increase in cost $ 25,000 <br /> <br />The total cost of the project is $164,131,000 instead ,of the <br />$164,106,000 as used in the Definite plan Report. Inasmuch as the <br />increase in cost is relatively small compared to the total cost of <br />the project, it did not appear warranted to revise the payout <br />analysis nor to make all the necessary changes in the tables and <br />narrative to incorporate this change at this time. The actual <br />effect on payout is insignificant. <br /> <br /> <br />-'-.'.'- .' <br />,./ " <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.