Laserfiche WebLink
<br />13~d <br /> <br />2 <br /> <br />orr.PATIlIG PRliICIPU;S, FRYINGPAN-ARKANSAS PROJl;CT <br /> <br />. <br /> <br />($") "Ruedi Reservoir" means the re'servoir presently <br />pianned for construction on the Fryingpan Fiver above <br />the town of Ilasalt as part of .the project. <br />(h) "Ashcroft Reservoir" means not only the reservoir con- <br />templated for construction on ,Castle Creek, a tributary of <br />the RoarinF. Fork River, but also, unless the context 1"8- <br />~uires otherwise, any other reservoir that may be construc- <br />ted in the Roaring Fork basin 'above the town of Aspen in <br />lieu of that reservoir. <br />(1) "c.f.s." means cubic feet of water per second of time. <br />2. The Ruedi Reservoir shall be constructed and maintained on <br />the rryingpan River above the town of Bascilt with an active capacity <br />of not less than 100,000 acre-feet. ,In addition thereto and in <br />order to offset adverse streamflow conditions on the Roarin~ Fork <br />River above the town of Aspen which might occur as a result of the <br />project enlar~8ment of the Twin Lakes Reservoir, the Ashcroft <br />Reservoir on Castle Creek, or some reservoir in lieu thereof, shall <br />be constructed on the Roaring Fork draina~e above, Aspen to a capaci- <br />ty of approximately 5,000 acre-feet: providin~, However, That the <br />Ashcroft Reservoir shall ba constructed only i, the Secretary of the <br />Interior after appropriate study shall determine that its benefits <br />exceed the costs: And providin~ further, That no part of the con- <br />structio~, operatio~or maintenance ofl said Ashcroft Reservoir shall <br />be char~eable to the Fryinr.pan-Arkansas project. <br />All of such stored water shall be released under the conditions <br />and limitations hereinafter set forth. <br />3. The receipts from the sale of water from Ruedi Reservoir, CUI <br />permitted in para~raph b(b) hereof, shall be applied solely to the <br />operatial and maintenance costs and to those reimbursable construc- <br />tion costs Of said reservoir which exceed $7,600,000. The cost of <br />per~tual operation and maintenance of the Ruedi Reservoir shall he <br />borne by usere of project water and users of water stored in Ruedi <br />Reservoir in such proportion as may be determined by the' Secretar, <br />of the Interior. ' . <br />4. The inclusion of the Ruedi Reservoir in the project shall <br />not preclude the construction of any other replacement or re/lUla- <br />tory reser,:,oirs on the Colorado River or its tributaries above Cameo, <br />gaging station. <br />5. The Ruedi Reservoir shall be co~leted and in operation <br />before any water is diverted to easterni Colorado by means of the <br />project. <br />6. (a) The replacement capacity of Ruedi Reservoir, and any <br />reservoir constructed in addition thereto, is that portion of the <br />total reservoir capacity required to permit project diversions at <br />times when such diversions could not otherwise be made because of <br /> <br />!. <br /> <br />. <br />