My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01334
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01334
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:30:32 PM
Creation date
10/11/2006 10:20:18 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.400
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Land Management
Basin
Colorado Mainstem
Water Division
5
Date
11/1/1996
Author
BLM
Title
Decision Record and Finding of No Significant Impact for Adoption of Standards for Public Land Health and Guidelines for Livestock Grazing Management in Colorado
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />l\) <br />co <br />00 <br />w <br /> <br />UNCOMPAHGRE BASIN RESOURCE MANAGEMENT PLAN <br /> <br />The Uncompahgre Basin RMP is amended to include the standards for public land heatth and <br />guidelines for liv,stock grazing management dated November 1996.ExistingRMP decisions modified or <br />replaced by adoption of standards for public land heatth and guidelines for livestock grazing <br />management. <br /> <br />Page # in . Description of Change/Rationale <br />Approved RMP . (modifications are shown in italics) <br />20 Modify the first sentence under'Livestock Grazing by adding, "commensu~te .. <br /> with public land health" so it reads, "Livestock grazing and facility maintenance <br /> will be managed at levels and conditions established prior to wilderness <br />.,' designation commensurate with public land health .standards;" <br /> Rationale: This modification is needed to assure consistency with the standards <br /> and guidelines. <br />22 . Modify the first sentence of the second paragraph under Management Unit 8, by' <br /> adding, "commensurate with public land health standards" so it resds,"The <br /> management unit will be managed as open to OHV use, commensurate with. <br /> public land health standards." <br /> Rationale: This modification is needed to assure consistency with the standards. . <br /> <br />Recommended by: <br /> <br />~a-.~~ <br /> <br />1(lIan Belt, Are~anager <br />Uncompahgre Basin Resource Area <br /> <br />/j~/?'h <br />ate <br /> <br />22 <br /> <br />"',- <,q,k " <br /> <br />,;-. <br /> <br />-'1. <br /> <br /> <br />3~ <br /> <br />:1 <br /> <br />..f <br /> <br />>> <br />, <br />x <br /> <br />" <br />;'t <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.