Laserfiche WebLink
<br />stage of the cost allocation method and <br />the sum of the separable costs deter- <br />mined for the components of the na- <br />tional economic development objective. <br />5. Appiication 01 the cost allocation <br />method. The cost allocation method de- <br />scribed herein shall be 8pplled to all <br />multiobjective reservoir projects or <br />plans. In the case of other types of proJ- <br />ects or plans where currently some <br />va.riation of the separable costs- <br />remaining benefits method of cost alloca- <br />tion is used. 01' another procedure to <br />allocate project economic costs among <br />project purposes is used, national eco- <br />nomic development coSts allocated to the <br />na.tional economic development objective <br />under stage 1 of the method described <br />hereIn. may continue to be allocated <br />among components of the national eco- <br />nomic development objective following <br />those procedures. <br />6. Review of cost allocations. Cost al- <br />locations will be reviewed to the extent <br />appropriate when new contributions are <br />made to objectives or their contributions <br />cease, or when there is a material change <br />in the level of contributions made to- <br />ward the objectives and their compo- <br />nents served by a project or plan. A re- <br />vised cost allocation or a modiflcation <br />of the existing allocation will be made <br />11. as the result of such review, it ap- <br />pears that a Significant inequity may <br />result if the existing allocation is not <br />revised or modified. Due consideration <br />will be given, in the event of a revision <br />or modification of an existing allocation, <br />to the relative periods of time over which <br />contributions are made to the various <br />objectives and their components. <br />The standards followed for the exist- <br />ing a.Ilocation w1ll generally be followed. <br />in the revised, allocation. <br />In the case of minor mod11lcations, <br />such as the withdra.wal of water for <br />municipal water supply from existing <br />storage space, costs may be assigned to <br />the new component in proportion to <br />50me comparable measure of use such <br />as storage capacity. or on the basis of <br />the value of the contributions made. I:f <br />contributions to the new component re- <br />sult in a reduction in the contributions <br />made to an existing reilhbursable com~ <br />ponent. the cost assigned to the new <br />component should be no less than the <br />1058 in revenues for the existing <br />component. ,-I <br />7. Case examples. Attached to this <br />section are five case examples lllustrat- <br />ing the use of the cost allocation method <br />described herein. <br />B. REIMBURSEMENT AND cosr SHARING <br />1. General. Current reimbursement <br />and cost-sharing policies will be re- <br />viewed in their entirety at an early date <br />in light of experience gained from ac- <br />tual application of the new planning <br />principles and standards. At that time, <br />the basis for reimbursement and cost <br />sharing now required, the need for ad- <br />Justment of these policies, the need for <br />new reimbursement and cost-sharing <br />policies for other objectives and their <br />components or entirely.new approaches <br />and appro~r1ate repayment arrange- <br /> <br />NOTICES <br /> <br />24183 <br /> <br />ments and interest rates for repayment tion of the following methods as may be <br />wlll be extensively reviewed. Until this determined appropriate by the head of <br />comprehensive review is completed, all the Federal agency baving jw1sdfction <br />current reimbursement and cost-sharing over the plan: (1) Cash payment upon <br />pOlicies are consIdered to be in full force completion of construction of major fea- <br />and effect. tures of a project. or plan providing <br />Until such a review is completed in- streamflow augmentation, in an a.mount <br />terim reimbursement and cost-sharing equivalent to the present worth of such <br />arrangements may be recommended for costs discounted as appropriate using the <br />consideration in individuall authoriza- interest rate in efrect under the provi- <br />Uon reports when the plan involves an sions of these Standards for the fiscal <br />objective or component for which no year in which the cash payment is made; <br />reimbursement or cost-sharing policy (2) 'repayment in kind by provision of <br />has yet been established. goods or services needed for the plan <br />2. Cost sharing for enhancement of valued at fair market value under the <br />water quality. A cost:;Bharlng policy-for- same-terms-and-conditions as-discussed -- <br />enhancement of water Quellty is hereby above for a oash payment; or (3) re- <br />adopted for Federal and federally as- payment within a 50-year repayment <br />sisted projects or plans. Until general periOd of an amOWlt equivalent to the <br />legislation as necessary is approved to present worth of such costs discounted as <br />implement this policy, authorization re- above, with interest based .upon the in- <br />ports when appropriate wtll make recom- terest rate in effect under the provisions <br />_ mendations consistent with this pollcy. of these standards for the mcal year in <br />When storage or facilities to augment, which the repayment contract is signed. <br />divert, retain, or otherwise regulate The non-Federal share of the plan <br />streamflow in addition to those prOvided opemtioIl, maintenance, 'and replace- <br />for water supply, recreation, and other ment costs allocated to the environ- <br />uses, are Included in a plan for the pur- .mental quality objective for this com- <br />pose of meeting water Qual1ty standards, penent sha.ll be borne by non-Federal <br />the value of the provision of such stor- interests under either or both of the fol- <br />age or fac1l1ties for this purpose shall be lowing ~ethods as may be determined <br />taken into accoWlt in determining the appropriate by the head at the Federal <br />total beneficial effects of the entire plan agency having jurisdiction over the plan: <br />of which they may be a part. (1) Cash paymen.t annually to the Fed- <br />The tota.linvestment costs of the plan . eraI Government, or (2) operate and ad- <br />allocated to the environmental quality minister storage or facilities provided for <br />objective for such streamflow regulation the purpose of meeting water Quality <br />to meet water quality standards shall be standards and bear all the costs C1! oper- <br />borne equally by the Federal Govem- ation. maintenance, and replacement m- <br />ment and non-Federal entitles. The total curred therefor but not to exceed the <br />operation, maintenance, and replace- total of such casU; allocated to the en- <br />ment costs of the plan allocated to the .. <br />environmental quality objective tor this vlronmental quality objective for this <br />purpose shall be a non-Federal component. <br />responsibility. ILLUsrRATION OJ' COST ALLOCATION METHOD <br />The non-Federal share of the tnvest- <br />. ment costs of the plan allocated to the <br />environmental quality objective for this <br />component shall be borne by non-Federal <br />interests, under any one or a oombina.- <br /> <br />'- <br />~ <br />f <br />t <br />Ii <br />~ <br /> <br />11 <br />u <br />I, <br /> <br />Case I-Incremental scale Included In plan <br />IIntend&d. pr1.m&rlly to 6eI"Ve only one ObJec- <br />tive ather than the nat:1onal ecoIlOJD01c deve1- <br />opmeDlt; objective. <br />A. Project Dtda.: <br /> <br />NED Plan A <br /> <br />Recommended Plan B <br /> <br />" <br /> <br />NED obJective: <br />Benellc1al effects: <br />FC..___________.___....h....h... <br />RllCrtQtloli...nn____.__.___.___._. <br />Power._..________n__n___.______. <br /> <br />.,. <br />20 <br />ao <br />'00 <br /> <br />SO' <br />30 <br />" <br />'20 <br /> <br />Total.____ ______.___h_U.h__. <br /> <br />AdverseeffecLll: . <br />Project COll!ltmctlOl1 and OM&: Rn. liO lXl <br />Net beneftclal ef!'ecLll_______h__h__h. liO SO <br />EQ obJective: <br />Beneflclal and adveI'3e effecl.ll.._hhh' In___________h_d__nh__h__h_ 1. Moot State watllJ' qua.llty <br />etandards over lOO-mJIe stcEllWU <br />2. 8.000acre5 fblt wBtlll"__________n 2.. a,liOO aerm flat water. <br />B. Inundate 10 mlles tree flow1n&' a. Inundate II miles tree flowl.ug <br />stream. Itream. <br /> <br />RDobJllCtlve: <br />Income: <br />Beneliciale.llects: <br />FC.____n__u__..._n___...n SliO <br />Recreatlon....._h..h.___.._. 15 <br />Power..______________________. 80 <br />Additional net Income aec.ru. 10 <br />ing tl:!reg:lon.. <br />To1al....__.___n___hhu. 105 <br />Adverseetl'ectB: <br />Re1mbursament. _____________ 26 <br />Net beneflelal e1Jects.._.....nn____ 80 <br />:&m~~~~I: and BdvEllM ef!'ecbl..._._ 1. Create 300 Jobs. <br />Reg\oaal eoonomlc base llDd at:abIl1ty: <br />Benefl.clnl aud adverse a1rect.!L_n_. 1. Create 3DO low paid 15e8sona <br />lobo. <br /> <br />$'" <br />" <br />" <br />.. <br /> <br />." <br />" <br />'00 <br />1. Create300Joba; <br />1. Create 300 low pBtd Ilea.sonal <br />lobo. <br /> <br />llO, 245-pt, II--8 <br /> <br />FEDERAL REGISTER, VOL 36, NO. 245-TUESDAY. DECEMBER 21, 1911 <br />