Laserfiche WebLink
<br />SUMMARY SHEETS (Continued) <br /> <br />ESTIMATED COSTS <br /> <br />Construction costs (January 1980 prices) <br />McPhee Dam and Reservoir, Great Cut Dike <br />Monument Creek Dam and Reservoir . . <br />Great Cut Pumping Plant, Switchyard, and <br />Transmission Line . . . . . . . . . <br />Sprinkler Pumping Plants, Switchyards, and <br />Transmission Lines . . . . <br />Dove Creek and South Canals . . . . . <br />Dolores Tunnel and Canal . . . . . . . <br />Towaoc Canal, Laterals, and Transmission Line <br />Cortez-Towaoc Pipeline . ., . . . <br />Drains . . . . . . . . . . . . . . . . <br />Dolores protective dikes and landfill <br />Permanent operating facilities . . <br />Operation and maintenance housing <br />Recreational facilities . . . . . <br />Fish and wildlife facilities . . . <br />Service facilities, depreciation, and salvage <br />Archaeological program <br />Future year capacity . . . . <br />Power facilities . . . . . . <br />Total construction cost <br />Annual operation, maintenance, and replacement <br />costs (1977-79 prices) . . . . . . . . . <br /> <br />$100,000,000 <br />3,100,000 <br /> <br />17,130,000 <br /> <br />33,438.000 <br />31,000,000 <br />1/4,500,000 <br />- 37,980,000 <br />4,000,000 <br />6,300,000 <br />1,550,000 <br />3,820,000 <br />190,000 <br />8,440,000 <br />8,505,000 <br />o <br />8,100,000 <br />140,000 <br />20,540,000 <br />298,733,000 <br /> <br />1,695,000 <br /> <br />1/ The incremental cost of the power facilities is their total <br />construction cost less $6,000,000 removed from the cost of Towaoc Canal <br />because the drop structure at the'uppermost reach would be replaced by <br />the power facility. <br /> <br />4 <br />