Laserfiche WebLink
<br />Salinity Control Activities <br /> <br />gat ions: collection of data lor preparation 01 <br />designs and cost estimates: archeological and <br />biological evaluations, collection 01 dala for <br />environmental assessments: and studies of on- <br />farm programs with major improvements 10 be <br />accomplished in the canal delivery systems. <br />Feasibility studies were continued on <br />each of the 12 other authorized units. These <br />activities included ground and sur/ace water <br />measurement and Quality sampling, drilling <br />exploratory wells. mapping, studying seepage on <br />canals, scheduling irrigation, and formulating <br />plans <br /> <br />I... <br /> <br />~~ <br /> <br />~ <br /> <br />....... <br /> <br />- <br /> <br />Planning work continued on the Paradox <br />Valley and Grand Valley Units. Colorado: and the <br />Las Vegas Wash Unit. Nevada, which were <br />authorized by the Colorado River Basin Salinity <br />Control Act (P.L. 93-320. June 24, 1974). This <br />work includes surface and ground water investi- <br /> <br /> <br />.~_ ii..LJJ:JI <br />1..1- -.~.. <br />IlE!lBDI <br /> <br />L~ <br />)";::' <br />t <br />___.,J!//. <br />"0/'" <br />~~ <br /> <br />MaJntftnancft on Unit No. 7 - Glen Canyon Unit <br /> <br />A charter for the Colorado RI...er Basin <br />Salinity Control Advisory Council was hied with <br />the Congress on February 25, 1976 The initial <br />meeting 01 the Council was held on March 23, <br />1976, in Den...er, Colo. <br />The Colorado R....er Basin Salinity Control <br />Forum continued its study 01 the "Water Quality <br />Standards for Salinity Including Numeric Criteria <br />and Plan of Implementation lor Salinity Control, <br />Colorado Ri...er System," <br />The Colorado Ri...er Waler Quahty Qllice <br />was established at the E&R Center to provide pro- <br />gram management. coordination. and e...aluation <br />of salinity control and water management ellorts <br />in the Colorado Ri...er Basin <br /> <br />7 <br />