My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01264
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:30:11 PM
Creation date
10/11/2006 10:18:11 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1976
Author
USDOI
Title
Twentieth Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONSTRUCTION <br />ACTIVITIES <br /> <br /> <br />During the year,lhe contractor lor Crystal <br />Dam. Curacaoli Unit, lopped oul one block in the <br />spillway, The highest concrele bloCk was within <br />12 leel of the top of the dam, with the remaining <br />blocks slightly lower. Concrete placement in the <br />dam was 86 percent complete, with about <br />142.130 cubic yards in place. The dam will be 340 <br />leel high when completed. Also during the year, <br />the pcwerplant struclural concrete reached a 95 <br />percent completion point. Electrical work Is <br />Scheduled 10 begin soon. <br />On Ihe Transmission Division, work was <br />initialed on the Hayden Substation This work Is <br />approximately 99 percent complete Construction <br />01 the Rille Substation was begun. This work is <br />about 5 percent complete. <br />On the Glen Canyon Unit. work on the <br />hospital modifications was completed and a con. <br />tract was awarded on June 29, 1976, to repair the <br />Gten Canyon Bridge and 10 place curbs, gullers, <br />CRSP 100 <br />ANNUAL <br />COST OF <br />CONSTRUCTION <br /> <br />In S Million. <br /> <br />" <br /> <br />"... <br /> <br />" <br /> <br />__n <br /> <br />n <br /> <br />Fiscal Year 676869 70 71 72 73 74 75 76 <br /> <br />o <br /> <br />~~ <br /> <br />and sidewalks, and surface streets at Page, Ariz. <br />For the Hammond Project, Irashracks lor <br />the pumping plant and a water meler were added <br />On the NavaJO Indian Imgatlon ProJect. <br />work continued on the main canal Tunnel No 4 <br />was completed in September 1975. Construction <br />was started on Tunnel No 5 in October 1975 and <br />work continues <br />On Bonneville Unit, Central Utah PrOJec!. <br />the contractor continued construction 01 Currant <br />Creek Dam, installing sections 01 steel pipe. <br />excavating the righl abutment cutoll trench, and <br />placing the Ilrst stage concrete for the outlat <br />works Exploratory drilling was completed lor the <br />Hades and Rhodes Tunnels, and Val and Rhodes <br />Diversion Dams In addition, contracts were <br />awarded for North Fork Duchesne River Road. <br />Rock Creek Road. and Vat Tunnel <br />For the Vernal Unlt. a contract was <br />awarded for construction 01 drainS <br /> <br />CRSP <br />ACCUMULATED <br />COST OF <br />CONSTRUCTION <br /> <br />rtnn l~ <br /> <br />in SMilllons <br /> <br />.<4 <br /> <br />750 <br /> <br />'00 <br /> <br />I <br />~ ~ <br /> <br />250 <br /> <br />o <br /> <br />FIscal Year 67686970 71 72 73 74 75 76 <br />