<br />Rate of Repayment <br /> <br /> <br />During FY 1976 a lolal 01 $23 million was <br />applied toward repayment 01 the Federal Invesl- <br />ment in the Colorado River Storage Project and <br />Participating Projects. Total repayment received <br />\0 date amounts to $91 million, which is 12 per- <br />cent althe $750 million completed plant-in-ser- <br />vice and 4 percent of the $2'1, billion projected <br />lolal reimbursable Federal investment in the <br />authorized storage Units and participating proj- <br />ects In addlllon \0 the amount applied to repay- <br />ment. the project earned revenues sulhcient 10 <br />pay all operating costs and currenl interest and <br />replacement costs_ Operating costs 01 participat- <br />ing projects which have been turned over to the <br />water conserl/ancy districts lor operation were <br />paid by the respective conservancy districts <br />Nearly one-third 01 the projected Federal invest4 <br />menl was in service as of the end of the liscal <br />year <br />Power sales produced 96 percent of the <br />net revenues during FY 1976. These power <br />revenues were applied toward the power Invest. <br />ment in the storage units and participating prol. <br />ects About 11 percent of the estimated power <br />investment has now been repaid. The $22,5 <br />mitllon repaid in FY 1976 Is about a 30 percent <br />increase In net power revenues from FY 1975. <br />During FY 1976 more than a hall million <br />dollars In repayment revenue came lrom municl4 <br />pal and industrial water sales Irom Glen Canyon <br />and Navajo Units This was all applied toward <br />repayment 01 the M&I Investment in the storage <br />units. An additional $102,000 in repayment <br />revenues came Irom municipal and industrial <br />water sales from live participating projects. This <br />amount was applied to repayment 01 M&llnvest. <br />ments in the participating projects. Revenues <br /> <br />received from the Irrigators 01 eight participating <br />projects, amounting to $222,000 in FY 1976, have <br />been applied to repayment of irrigation investment <br />in the participating projects. <br />Repayment contracts have been <br />e)(ecuted lor 14 participating projects to date. 01 <br />the 24 authorized participaling projects, 13 have <br />been constructed or are under construction. Two <br />have not yet started construction but have <br />e)(ecuted repayment contracts, three are nearing <br />e)(ecution of repayment contracts, one has been <br />postponed indefinitely and the remaining five are <br />in the advance planning stage. <br />In order to provide revenues sulficient to <br />pay annual operating costs of the storage units, to <br />provide for replacements, to pay interest charges, <br />to repay reimbursable costs of the authorized <br />storage units, to provide needed repayment <br />assistance for authorized participating projects <br />within the time limits prescribed by law, and to pay <br />specified salinity costs, it is necessary to increase <br />the CRSP power selling rate. It is proposed to <br />increase the current power rate by about 7 per. <br />cent in January 1977, and to increase that rate by <br />approximately another 24 percent beginning in <br />fiscal year 1980. The proposed liscal year 1980 <br />rate would be about 36 percent above the original <br />CRSP power rate which was in effect prior to April <br />1974. These increases are rellected in Exhibit A. <br />Reasons lor the projected increase <br />include the inflationary rise in present and pro- <br />jected power system operating costs, estimated <br />higher costs to complete construction of the <br />authorized storage unit and participating projecl <br />facilities, reduction in estimated power revenues <br />because of projected acceleration of water deple. <br />tions, inclusion 01 future payment trom power <br /> <br />revenues 01 a portion of the estimated construc- <br />tion and operating costs 01 four authorized Col- <br />orado River Salinity Control Projects (P.L. 93.320, <br />88 Stat. 266), reductions in estimated power <br />revenues because 01 the proposed establishment <br />01 a rate lor project irrigated pumping power less <br />than the commercial rate, and the proposed addi. <br />tions of wheeling charges for Ihe flow of CRSP <br />power over the transmission systems 01 the <br />Parker-Davis Project and the Pick.Sloan Missouri <br />Basin Program <br />Projections using current estimates 01 <br />CRSP costs, construction schedules and reve- <br />nues from power sales (including proposed rate <br />increase!. municipal and industrial water sales, <br />payments by irrigators. ad valorem laxes and <br />miscellaneous revenues, shOw that payment of <br />the reimbursable costs of the authorized Colorado <br />River Storage Project and Participating Pro,ects <br />can be accomplished within the authorized repay. <br />ment periodS <br /> <br />33 <br />