Laserfiche WebLink
<br />OGO~63 <br /> <br />Evaluation Factors <br /> <br />CostS <br /> <br />1. 1980 Construction Cost <br />2. Annual OoM Cost <br />3. Annual Cost (40 yrs @ 7%) <br />4, Annual Yield (AF) <br />5. Unit Cost ($/AF) <br />6. Unit Cost ($/1000 gal) <br /> <br />Table 4 <br /> <br />(Continued) <br /> <br />System Component <br />Battle- Jack Ck- Jack <br />Jack Ck N Platte Creek <br />Pipeline Pipeline Reservoir <br /> <br />77,200,000 7,300,000 20,200,000 <br /> <br />45'000J <br />7,898,500 <br />30,000 Total System <br />263 <br />0.81 <br /> <br />VI-3 <br />