My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01249
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:30:04 PM
Creation date
10/11/2006 10:17:07 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1990
Title
Correspondence regarding the Final Biological Opinion - 1991
Water Supply Pro - Doc Type
Biological Opinion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'" ~" <br /> <br />. <br /> <br />2 <br /> <br />. <br /> <br />~~~n . <br /> <br />and Mancos Drainages and about 17,000 acre feet from the La Plata River <br />to the Mancos Drainage. In total, considering reuseable return flows, <br />it is estimated 198,200 acre feet of water will be diverted. <br /> <br />. <br /> <br />To accomplish this water diversion the project will include the construction <br />and operation of the Ridges Basin and Southern Ute Dams and Reservoirs, <br />the Durango and Ridges Basin pumping plants, several conveyance systems, <br />two diversion dams on the La Plata River (La Plata and Southern Ute), and <br />an electric power transmission line and associated facilities. It is <br />estimated facility construction will take 10 years to complete. <br /> <br />Non-project facilities that would likely be built, as a result of the <br />project, include two municipal water treatment plants, several pumping <br />stations that would develop necessary water pressure for sprinkler <br />irrigation, and numerous buildings. <br /> <br />The project irrigation water may be provided to 70,100 acres of land <br />in private ownership and the Ute Mountain Ute and Southern Ute Indian <br />Reservations. To accommodate the 118,100 acre feet.of irrigation water, <br />about 70 percent of this area will need sprinkler distribution systems. <br />clearing. and land leveling. The Indian land would require extensive <br />clearing. The 80,100 acre feet of water for municipal and industrial <br />use would be divided with approximately forty-one percent of this amount <br />furnished to the two Ute Indian Reservations primarily for development <br />of their coal resources. The remaining water would go to Durango, Aztec, <br />Farmington, other towns and the Navajo Indian Reservation. <br /> <br />The peregrine falcon, an inhabitant of the project area. was listed as <br />endangered in 1970. The decline of their population is attributed to <br />the presence of chlorinated hydrocarbon pesticides in their food supplies <br />which causes eggshell thinning, non-viable eggs. and increased adult <br />mortality. This species feeds largely upon migratory birds and typically <br />bunts riparian areas. Eyries are associated with cliff environments and <br />bluffs of gentle terrain. <br /> <br />A pair of peregrine falcons formerly nested on cliffs north of the proposed <br />Ridges Basin Reservoir. This historic eyrie was last occupied by breeding <br />peregrines in 1963. Recent sightings have been reported near the proposed <br />reservoir. though there is no post-1963 evidence of breeding. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.