My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01245
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:21:38 PM
Creation date
10/11/2006 10:17:05 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8046
Description
Section D General Studies - DSS
State
CO
Water Division
1
Date
2/6/1996
Author
George M Fosha
Title
Colorado Decision Support System - 1997-2001 - 1332.2 CRDSS - Colorado Documentation - Transmountain Diversion Projects
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-' \ <br />'/'OUi\'?l\l3 <br /> <br />The capacity of the Carlton Tunnel is reported to be approximately 300 cfs. However, due <br />to failure of sections of the tunnel. the current capacity is limited to about 50 cfs through a 30- <br />inch steel pipe installed on the floor of the tunnel. In order to make up for some of the lost <br />capacity, the City of Pueblo has contracted with the United States (USBR) to take deliveries of a <br />portion of the Busk-Ivanhoe System yield through the Boustead Tunnel of the Fryingpan-Arkansas <br />Project. The Busk-Ivanhoe water can readily be exchanged into the Fryingpan-Arkansas collection <br />system and both tunnels deliver the water to the same point, Turquoise Lake. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.