Laserfiche WebLink
<br />') <br /> <br />C. <br /> <br />Yampa River Reservoir Studies: <br /> <br />Work included working with USGS to get out a draft of the Yampa/Green sediment <br />monitoring report. When a draft report was completed I arranged for peer review of <br />the report and worked with the author to incorporate the peer review comments. <br />Other work on the Yampa issues were limited to discussions with Colorado Parks <br />attempting to negociate a new long-term lease for Ste~boat Lake and working with <br />the Program Directors office in deciding on pros and cons of using water from <br />Steamboat Lake. Some guidance was provided to the Program Director on issues <br />relating to Elkhead Reservoir enlargement and the prospects of the status of <br />negotiations with Parks. <br /> <br />D. Coordinated Reservoir Operations: <br /> <br />No Coordinated Reservoir Operations discussions were held in 2002 because of the <br />severe drought condition which were present in the basin early in the spring of2002. <br />Conversely because drought conditions were so severe there was contentious <br />discussions with the Biology Committee and water users what water was available <br />for summer/fall flow augmentation and how it should be used. These operations are <br />covered elsewhere in this report. <br /> <br />E. <br /> <br />General Support Activities: <br /> <br />Served as Chainnan of the Water Acquisition Committee where the following tasks <br />were performed: 1) prepared meeting summaries for all WAC meetings and reports <br />to the Management Committee, 2) prepared annual reports to the Colorado Water <br />Conservation Board on Ruedi flows and associated benefits to the IS-Mile Reach, <br />and 3) prepared Scopes of Work and annual reports for the following projects: <br /> <br />1. Water Right Consultant Services <br />2. General gage operation and maintenance <br />3. Steamboat Lake water lease <br />4. YampalGreen Sediment Sampling <br />5. Water acquisition Hydrology Support <br />6. IS-Mile Reach Channel Monitoring <br />7. Peer review of Geomorphology <br /> <br />As chairman of the Water Acquisition committee, I serve as coordinator for Grand Valley <br />Water Management, Redlands Gage, Coordinated Reservoirs, and the two eWCB <br />projects. Many of the tasks included attending meetings, reviewing reports, providing <br />comments, and reporting to the Service and WAC. I also participated in discussions of <br />Division 4 & 5 SWAT Groups. <br /> <br />VII. Recommendations: Continue general hydrology support for Water Acquisition activities. <br /> <br />I9H~3 <br />