<br />, .'.'llPERATION AND ~IAINTENANCE
<br />
<br />19
<br />
<br />,.
<br />
<br />On December 14, 1952 an additional 50,000 kw of generating
<br />capacity at Parker power plant was made available to the District.
<br />This gives the District under existing contracts a total generating
<br />capacity of 297,500 kw, sufficient to provide at least 1,675 million
<br />kilowatthours annually for pumping about ROO,OOO acre, feet of
<br />water through the aqueduct.
<br />
<br />Hoover )Jower pl((nt
<br />
<br />The City of Los Angeles, Southern California Edison Compan,',
<br />California Electric Power Company, the California,Pacific Utilities
<br />Company, all in California. and the Citizens Utilities Company at
<br />Kingman. Arizona, purchase all Hoover Dam firm energy allocated
<br />to the District but unused by it. Tables 3 and 4 show use by the
<br />District and resale to others of the District's allocated obligation
<br />of Hoover firm energy.
<br />Generating charges for units N5 and N6 at Hoover power plant
<br />are shared with the City of Los Angeles and Southern California
<br />Edison Company in proportion to the use of each, Transmission
<br />costs are shared in the same manner. However, the District retains
<br />the right to use both facilities as needed for its own requirements.
<br />
<br />GENERATING COSTS AT HOOVER DAM
<br />
<br /> PAl[) Bl DI~TRln ~f.T
<br /> Ef)I~ON ANU DISTRICT (.ENUtATINl;
<br />OI'EHATlr-'r: GROSS CITY OF PERCENT COST. MILL';;
<br />YL\R CHARGES Los A NCELES OF GRU:;'S PER KWHR
<br />19~5-~6 !.') IJlI)llth~ I ......1155,21",19 1109.412,,,5 29.5 1.022
<br />lQ46-..J7 . 362,725.27 312,01l.55 14,0 ,3RO
<br />19t7.tH ' 368.466,59 281,372.46 23,6 .297
<br />19tM9, ....... ,181,68t,m 26..J.267.AO .10,6 ,359
<br />19t9",0 , ......, 319,141,1:1 2t9,611,68 3t,2 ,063
<br />]%0-51 373,203.4-2 2..JI,229.07 3",4 ,390
<br />1951,,,2 , ' ,184,880,18 ]83.788,09 52.2 ,456
<br />1952",,1 ........ 381.160,61 2,,1.2iO,13 32.5 ,,,0,,
<br />
<br />JOINT TRANSMISSION LINE COSTS
<br />
<br />fll'EFL...TII\'(;
<br />'n;.-\R
<br />
<br />19..JS...j.6 C') l11onth<1 ..
<br />]946.47
<br />19.:!-7-+8
<br />1948.49
<br />1949,,,0
<br />19.50,51
<br />1951,52
<br />1952,53
<br />
<br />GH(/:-:.S
<br />CIlAHG~:-:;.
<br />
<br />PAID BY
<br />EDISON AND CITY
<br />OF L()~ ANGEl.ES
<br />
<br />DISTRICT
<br />PEHCENT
<br />OF (;1l0S:O:;
<br />
<br />. $ 89,755.63
<br />................................ 2]Y,373.9i
<br />........ . 226,629.50
<br />23",361.18
<br />256.161,32
<br />.............. ....,..........., 2W,6"I,,,6
<br />242,010,85
<br />, 269.316,78
<br />
<br />S 68,921.39
<br />17S.5S9.82
<br />145,860.53
<br />121,859,24
<br />125,650,06
<br />121,086,20
<br />1I6,915,I3
<br />186,475.45
<br />
<br />2.1,2
<br />20,0
<br />35,6
<br />45,1
<br />50,9
<br />49,7
<br />51.7
<br />30,R
<br />
<br />.[ncluue:-; maint';'l1fLllce. illter~!"t, ta.X(.S. anJ tl..pr.,ciation of joint tr:lllSmissini1 lillt;.