<br />moved to Iron Mountain, where construction was started on two
<br />new houses, The two houses made vacant at Camino by this change
<br />were moved to Gene, where additional living quarters were urgently
<br />needed. Another house was made available at Gene by purchase
<br />from the Bureau of Reclamation of a house at Parker Dam. This
<br />house was rebuilt bo' District forces after it was moved to Gene
<br />village from Parker Dam.
<br />The following table shows the hours of pump operation, the
<br />energy used, and the water delivered during the fiscal year from
<br />July 1, 1952 to .June 30, 1953:
<br />
<br />PU.NT
<br />Intake
<br />Celie
<br />TrOll ;\lolltllain .
<br />Eagle J\.lountain
<br />Hayfield
<br />Camino
<br />
<br />PUMP HOURS
<br />OF
<br />OPERATION
<br />
<br />KWHH FOil
<br />PUJ\1PINr.
<br />60,834,1l()0
<br />64,297,000
<br />29,236.000
<br />88,~27 ,000
<br />fl9,022.000
<br />
<br />KWHR FOR
<br />STATION
<br />:o,ER\"ICE
<br />
<br />W."TER
<br />IIELI\"ERED,
<br />."CRF.-FEET
<br />
<br />9,8]3,63
<br />9,989,37
<br />10,325.98
<br />, ....,.. 10.339,07
<br />10,329,79
<br />
<br />Total..
<br />
<br />331,7]6,000
<br />
<br />2~7,700
<br />1.4R6,600
<br />609..100
<br />460,700
<br />475,700
<br />85.460
<br />3,365,660
<br />
<br />18],38]
<br />
<br />]69,354
<br />
<br />Total enl"rgy ll~ell on pumping system
<br />Tram.mis!i-ioll and transr,lrrnalil1n loss......
<br />
<br />KWHR
<br />,.. .........., ...., ,135.081,060
<br />13,226,963
<br />
<br />Total Parker anJ Hoover energy used fllr pUIllJ.ling system.. ......... ........ :~--lB,30B,62~
<br />
<br />Tra1lsmisS1'O{/. and telephone syst.em
<br />There were two nonscheduled outages caused by lightning on the
<br />District's 240 miles of 230,kv transmission line, After each outage,
<br />service was restored immediately.
<br />There were 54 cases of telephone trouble on the District's 438
<br />miles of pole line. All trouble was of a minor nature, consisting
<br />of broken and crossed wires caused by windstorms, splitting of poles
<br />as the result of lightning, and broken insulators caused by hunters
<br />shooting at the line. There was one case of a brush fire annealing
<br />the copper wire to the extent that the wire had to be replaced.
<br />
<br />P(FWC1' 1'csource.'1 uud 7(SC
<br />The District has in operation under existing contracts for power
<br />from Hoover power plant a total of 165,000 kw. consisting of gene,
<br />rating units N5 and N6. An additional 82,500,kw generator will
<br />be released to the District on May 31, 1966, unless Nevada by four
<br />years' notice indicates a desire to continue its use, HOWever, the
<br />District may acquire unit N7 upon four years' notice rel(ardless of
<br />any notice given by Nevada,