Laserfiche WebLink
<br />. . ~ . <br />>~:..u <br />OPE RAT ION AND ~I A I N TEN A NeE <br /> <br />17 <br /> <br />moved to Iron Mountain, where construction was started on two <br />new houses, The two houses made vacant at Camino by this change <br />were moved to Gene, where additional living quarters were urgently <br />needed. Another house was made available at Gene by purchase <br />from the Bureau of Reclamation of a house at Parker Dam. This <br />house was rebuilt bo' District forces after it was moved to Gene <br />village from Parker Dam. <br />The following table shows the hours of pump operation, the <br />energy used, and the water delivered during the fiscal year from <br />July 1, 1952 to .June 30, 1953: <br /> <br />PU.NT <br />Intake <br />Celie <br />TrOll ;\lolltllain . <br />Eagle J\.lountain <br />Hayfield <br />Camino <br /> <br />PUMP HOURS <br />OF <br />OPERATION <br /> <br />KWHH FOil <br />PUJ\1PINr. <br />60,834,1l()0 <br />64,297,000 <br />29,236.000 <br />88,~27 ,000 <br />fl9,022.000 <br /> <br />KWHR FOR <br />STATION <br />:o,ER\"ICE <br /> <br />W."TER <br />IIELI\"ERED, <br />."CRF.-FEET <br /> <br />9,8]3,63 <br />9,989,37 <br />10,325.98 <br />, ....,.. 10.339,07 <br />10,329,79 <br /> <br />Total.. <br /> <br />331,7]6,000 <br /> <br />2~7,700 <br />1.4R6,600 <br />609..100 <br />460,700 <br />475,700 <br />85.460 <br />3,365,660 <br /> <br />18],38] <br /> <br />]69,354 <br /> <br />Total enl"rgy ll~ell on pumping system <br />Tram.mis!i-ioll and transr,lrrnalil1n loss...... <br /> <br />KWHR <br />,.. .........., ...., ,135.081,060 <br />13,226,963 <br /> <br />Total Parker anJ Hoover energy used fllr pUIllJ.ling system.. ......... ........ :~--lB,30B,62~ <br /> <br />Tra1lsmisS1'O{/. and telephone syst.em <br />There were two nonscheduled outages caused by lightning on the <br />District's 240 miles of 230,kv transmission line, After each outage, <br />service was restored immediately. <br />There were 54 cases of telephone trouble on the District's 438 <br />miles of pole line. All trouble was of a minor nature, consisting <br />of broken and crossed wires caused by windstorms, splitting of poles <br />as the result of lightning, and broken insulators caused by hunters <br />shooting at the line. There was one case of a brush fire annealing <br />the copper wire to the extent that the wire had to be replaced. <br /> <br />P(FWC1' 1'csource.'1 uud 7(SC <br />The District has in operation under existing contracts for power <br />from Hoover power plant a total of 165,000 kw. consisting of gene, <br />rating units N5 and N6. An additional 82,500,kw generator will <br />be released to the District on May 31, 1966, unless Nevada by four <br />years' notice indicates a desire to continue its use, HOWever, the <br />District may acquire unit N7 upon four years' notice rel(ardless of <br />any notice given by Nevada, <br />